Village Maintenance Schedule: Difference between revisions
Jump to navigation
Jump to search
Line 6: | Line 6: | ||
=Stock Production= | =Stock Production= | ||
*3" billet cast then hot rolled to 3" shaft - in aluminum, steel, and | *3" billet cast then hot rolled to 3" shaft - in aluminum, steel, and | ||
*TPU, TPO thermoplastic rubber stock with 80% recycle rate for tires, belts, other | |||
**Tire and track maintenance cost goes down to about 2% loss per year for 50 year tires, reprinted at end of life | |||
**About 100 tires and track pieces - 100 lb each. 5 tons of rubber stock. at 5 tons cost per 50 years, | |||
=Stock= | =Stock= |
Revision as of 22:07, 18 April 2022
Materials Production
- Gravel and rock for aluminum production, cement production, road base, foundation rock
- Foundation rock squares
- Clay for CEB block, then stabilized, and for ceramics
- Biomass for fungal soil food web plumbing (mycelium as water conduit)
Stock Production
- 3" billet cast then hot rolled to 3" shaft - in aluminum, steel, and
- TPU, TPO thermoplastic rubber stock with 80% recycle rate for tires, belts, other
- Tire and track maintenance cost goes down to about 2% loss per year for 50 year tires, reprinted at end of life
- About 100 tires and track pieces - 100 lb each. 5 tons of rubber stock. at 5 tons cost per 50 years,
Stock
- Stock steel sections available - 3" round shaft
- Aluminum - 3" round shaft.
Machines
- 3" automatic feed multimachine for precision parts for engines, 3D printers, cars, aviation, and high pressure pumps and vacuum pumps
- Basic Heavy Metal Workshop
- Wood shop.