Line 7: | Line 7: | ||
*Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing. | *Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing. | ||
*Smoke detectors are required on the electrical side - [https://www.cityofeasley.com/Rough-In%20Inspection%20Checklist.pdf] | *Smoke detectors are required on the electrical side - [https://www.cityofeasley.com/Rough-In%20Inspection%20Checklist.pdf] | ||
=Extreme Inspection Schedules= | |||
Some locations may have a large number of inspections, ideally these can occur on the same day if there are multiple similar ones. See [https://www2.minneapolismn.gov/media/content-assets/www2-documents/business/wcmsp-204538.pdf]. This calls for: | |||
#Excavation | |||
#Foundation | |||
#Underground plumbing | |||
#Rough plumbing/electrical | |||
#Framing | |||
#Insulation/vapor barrier - 2 inspections if foundation has exterior insulation | |||
#Final plumbing/mechanical | |||
#Final inspection. All done, street number and landscaping done. | |||
#Grid connection | |||
=Links= | =Links= |
Revision as of 22:48, 3 May 2022
Sequence
- The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [1]
- Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [2]
- Thus - is there a separate inspection for insulation prior to all sheathing?
OSE Case
- No insulation covers any wiring or plumbing work.
- Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing.
- Smoke detectors are required on the electrical side - [3]
Extreme Inspection Schedules
Some locations may have a large number of inspections, ideally these can occur on the same day if there are multiple similar ones. See [4]. This calls for:
- Excavation
- Foundation
- Underground plumbing
- Rough plumbing/electrical
- Framing
- Insulation/vapor barrier - 2 inspections if foundation has exterior insulation
- Final plumbing/mechanical
- Final inspection. All done, street number and landscaping done.
- Grid connection