New Industrial System: Difference between revisions
Jump to navigation
Jump to search
(Redirected page to OSE Campus#New Industrial System Narrative) |
No edit summary |
||
Line 1: | Line 1: | ||
# | At Level 1, we have Steel-Concrete-Plastic infrastructure - + CEB and Lumber at another $50k a pop. | ||
Initial cost was $750k. Add $50k, and double it - and we have $1.6M in as-built cost for infrastructure that gets us virgin steel and plastic from scrap, and concrete from rock. Coupled with lumber and CEBs, so we can build housing for free. | |||
At level 2, we must add | |||
#Precision machining for the [[Open Source Stackable Engine]] | |||
#Silicon production from quartz sand, and upgrading to microchips, and including transistors for power electronics | |||
#Hydrogen production as the new fuel. | |||
=Links= | |||
*[[OSE Campus#New Industrial System Narrative]] |
Revision as of 13:48, 30 May 2022
At Level 1, we have Steel-Concrete-Plastic infrastructure - + CEB and Lumber at another $50k a pop.
Initial cost was $750k. Add $50k, and double it - and we have $1.6M in as-built cost for infrastructure that gets us virgin steel and plastic from scrap, and concrete from rock. Coupled with lumber and CEBs, so we can build housing for free.
At level 2, we must add
- Precision machining for the Open Source Stackable Engine
- Silicon production from quartz sand, and upgrading to microchips, and including transistors for power electronics
- Hydrogen production as the new fuel.