Profit in Construction: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 4: Line 4:
**typical 7-10% markup on materials [https://www.angi.com/articles/general-contractor-markup.htm]
**typical 7-10% markup on materials [https://www.angi.com/articles/general-contractor-markup.htm]
**Typical 10-20% of overall cost on average [https://www.homeadvisor.com/cost/additions-and-remodels/general-contractor-rates/]
**Typical 10-20% of overall cost on average [https://www.homeadvisor.com/cost/additions-and-remodels/general-contractor-rates/]
*Gross profit is before overhead [https://www.google.com/search?sxsrf=ALeKk026QG9BbsZl0rNsBS9KmerMgczY_w%3A1602863734253&source=hp&ei=dsKJX6q8DJDYsAXHkpG4Cw&q=what+goes+into+overhead&btnK=Google+Search&oq=how+to+configure+nvidia+geforce+gtx+1650+super+on+linux+mint&gs_lcp=CgZwc3ktYWIQAzIFCCEQoAEyBQghEKsCMgUIIRCrAjoOCAAQ6gIQtAIQmgEQ5QI6DgguELEDEMcBEKMCEJMCOggILhDHARCvAToLCC4QsQMQxwEQowI6CAgAELEDEIMBOggILhCxAxCDAToFCAAQsQM6AggAOgQIABAKOgYIABAWEB46CAghEBYQHRAeOgcIIRAKEKABUMsQWOmzAWD8tAFoBnAAeACAAeQGiAGhS5IBDTExLjQ3LjMuMi42LTGYAQCgAQGqAQdnd3Mtd2l6sAEG&sclient=psy-ab&ved=0ahUKEwiqz4DcvLnsAhUQLKwKHUdJBLcQ4dUDCAk&uact=5]


=Lot Costs=
=Lot Costs=
Line 10: Line 11:


=OSE Case=
=OSE Case=
*If OSE is serving as the developer, OSE to charge the industry standard rate, OSE would have to charge about 20% developer profit.
*Based on OSE's integrated-enterprise architecture, OSE could function either as the developer, general contractor, or builder - or any combination of the above. A [[Distributive Enterprise]] is in a position to capture any or all of these 3 value streams.


=More=
=Links=
*[[Seed Home 2 Cost Structure]]

Latest revision as of 17:03, 27 June 2022

General Figures

  • How much profit does a developer make? 20% from project cost. [1]
  • How much profit does a general contractor make?
    • typical 7-10% markup on materials [2]
    • Typical 10-20% of overall cost on average [3]
  • Gross profit is before overhead [4]

Lot Costs

  • $47k in Tallahassee [5]
  • Average home lot is $85k [6]

OSE Case

  • If OSE is serving as the developer, OSE to charge the industry standard rate, OSE would have to charge about 20% developer profit.
  • Based on OSE's integrated-enterprise architecture, OSE could function either as the developer, general contractor, or builder - or any combination of the above. A Distributive Enterprise is in a position to capture any or all of these 3 value streams.