Free Walls: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*CEB block at 2 cents/block for CEB Block Cost") |
No edit summary |
||
Line 1: | Line 1: | ||
*CEB block at | *CEB block at 1 cents/block cost - [[CEB Block Cost]] - if labor is used to stack block directly in walls. Challenge: soil moving or digging, to site. | ||
*Max practical imported PV is 3.2 kw (320 sf) - multiplied 2x for 2 of these trailers per site. Telescoped to span between trailers - 4 trailer widths. Total of 8 trailers' worth = 25 kW of energy = 150kW hr/day. This is 2 kg/kwhr - 300 kg per day. Require | |||
*A campus has a quarry which is turned into a lake, as well as cement production, and lumber, and plastic production for free materials. |
Revision as of 23:19, 29 August 2022
- CEB block at 1 cents/block cost - CEB Block Cost - if labor is used to stack block directly in walls. Challenge: soil moving or digging, to site.
- Max practical imported PV is 3.2 kw (320 sf) - multiplied 2x for 2 of these trailers per site. Telescoped to span between trailers - 4 trailer widths. Total of 8 trailers' worth = 25 kW of energy = 150kW hr/day. This is 2 kg/kwhr - 300 kg per day. Require
- A campus has a quarry which is turned into a lake, as well as cement production, and lumber, and plastic production for free materials.