SEH Build Process Questions: Difference between revisions
Jump to navigation
Jump to search
(Created page with "#For flange-mount electrical boxes - when the box is fixed to the wall - must all the screws be already used on the flange, or can a temporary attachment be made? #If not, is...") |
No edit summary |
||
Line 1: | Line 1: | ||
#For flange-mount electrical boxes - when the box is fixed to the wall - must all the screws be already used on the flange, or can a temporary attachment be made? | #For flange-mount electrical boxes - when the box is fixed to the wall - must all the screws be already used on the flange, or can a temporary attachment be made? | ||
#If not, is there any other allowable means of temporary attachment that others use or may be used? (fishing for efficiency detail) | #If not, is there any other allowable means of temporary attachment that others use or may be used? (fishing for efficiency detail) | ||
#For the heat pump disconnect, is a nonmetallic push-in connector acceptable as a a clamping means for 10/2 cable for the incoming line? |
Revision as of 22:54, 19 September 2022
- For flange-mount electrical boxes - when the box is fixed to the wall - must all the screws be already used on the flange, or can a temporary attachment be made?
- If not, is there any other allowable means of temporary attachment that others use or may be used? (fishing for efficiency detail)
- For the heat pump disconnect, is a nonmetallic push-in connector acceptable as a a clamping means for 10/2 cable for the incoming line?