Module Integration: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
m (Marcin moved page Modul Integration to Module Integration)
No edit summary
Line 1: Line 1:
#Attach joints - shark bite fittings, plumbing fittings, electrical boxes
#Attach joints - shark bite fittings, plumbing fittings, electrical boxes
#Pre-make assemblies for attachment -  complete exposed shower side to loose holder, vent fan with wiring, CSED with breakers and knockout adapter; welded plumbing assemblies; water heater with fittings; water entrance
#Pre-make assemblies for attachment -  complete exposed shower side to loose holder, vent fan with wiring, CSED with breakers and knockout adapter; welded plumbing assemblies; water heater with fittings; water entrance; washer box, etc.
#Annotate modules - box locations with description, component labels
#Annotate modules - box locations with description, component labels
#
#Dingleassemblies - outlet box with coiled up wire of correct length, stapled next to box, flat so it doesn't stick out; cSEd premountes on wall module; plbingbattached spanning entire module ready for interconnect
#exterior boxes preattached with hole through wall and mount;

Revision as of 15:21, 3 November 2022

  1. Attach joints - shark bite fittings, plumbing fittings, electrical boxes
  2. Pre-make assemblies for attachment - complete exposed shower side to loose holder, vent fan with wiring, CSED with breakers and knockout adapter; welded plumbing assemblies; water heater with fittings; water entrance; washer box, etc.
  3. Annotate modules - box locations with description, component labels
  4. Dingleassemblies - outlet box with coiled up wire of correct length, stapled next to box, flat so it doesn't stick out; cSEd premountes on wall module; plbingbattached spanning entire module ready for interconnect
  5. exterior boxes preattached with hole through wall and mount;