Module Integration: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
#Washer, heater, prewired and plumbed | #Washer, heater, prewired and plumbed | ||
#Boxes prewired - with device - so electrical is verified. Test devices - light sockets dangling and tested | #Boxes prewired - with device - so electrical is verified. Test devices - light sockets dangling and tested | ||
#Cabinets pre-cut. Big kitchen table pre-glued. Sink cutout for clamping. |
Revision as of 15:34, 3 November 2022
- Attach joints - shark bite fittings, plumbing fittings, electrical boxes
- Pre-make assemblies for attachment - complete exposed shower side to loose holder, vent fan with wiring, CSED with breakers and knockout adapter; welded plumbing assemblies; water heater with fittings; water entrance; washer box, etc.
- Annotate modules - box locations with description, component labels
- Dingleassemblies - outlet box with coiled up wire of correct length, stapled next to box, flat so it doesn't stick out; cSEd premountes on wall module; plbingbattached spanning entire module ready for interconnect
- exterior boxes preattached with hole through wall and mount;
- Trim pre-painted
- Washer, heater, prewired and plumbed
- Boxes prewired - with device - so electrical is verified. Test devices - light sockets dangling and tested
- Cabinets pre-cut. Big kitchen table pre-glued. Sink cutout for clamping.