=Post-Permit Working Doc= | =Post-Permit Working Doc= | ||
As we fless out execution, some details change. The [[Maysville Permit]] doc shows the original submission. Here is the design iteration after ground-truthing. | As we fless out execution, some details change. The [[Maysville Permit]] doc shows the original submission. Here is the design iteration after ground-truthing. | ||
<html> ________________________________ </html> | |||
[_______________________________________ edit] | |||
=Maysville Permit Doc= | =Maysville Permit Doc= |
Revision as of 01:17, 20 November 2022
Post-Permit Working Doc
As we fless out execution, some details change. The Maysville Permit doc shows the original submission. Here is the design iteration after ground-truthing.
________________________________
[_______________________________________ edit]
Maysville Permit Doc
House construction permit for Maysville:
Designg and Utilities
- Maysville Permit - shows design concept for the public record.
- Rosebud 3 Building Book - [1]
- SEH 4 Plumbing
- SEH 4 Electrical