Interior Wall Build Process: Difference between revisions
Jump to navigation
Jump to search
(Created page with "#Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.") |
(No difference)
|
Revision as of 21:34, 22 January 2023
- Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.