Interior Wall Build Process: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "#Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.")
(No difference)

Revision as of 21:34, 22 January 2023

  1. Wall 1 - foundation 3" stub is level with foundation. Module 1 inserts into stub so main stack is connected upon installation of Module 1.