Routine Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
Line 3: Line 3:
Every day:
Every day:
*Data collection and procedures: based on past day, document build procedures for as-built practice - the part after the 'build procedure' which is theoretical.
*Data collection and procedures: based on past day, document build procedures for as-built practice - the part after the 'build procedure' which is theoretical.
*CAD work -  or review existing CAD or if no new CAD exists design a new module. CAD should always reconcile with BOM, so CAD work might mean extracting a spreadsheet of parts. Automate this later with part libraries.
*CAD work -  or review existing CAD or if no new CAD exists design a new module. CAD should always reconcile with BOM, so CAD work might mean extracting a spreadsheet of parts. Automate this later with part libraries. See [[OSE FreeCAD Workbenches]]
*Document big picture build procedures (fabrication diagrams) for larger projects, such as for the whole house.
*Document big picture build procedures (fabrication diagrams) for larger projects, such as for the whole house.

Latest revision as of 13:52, 2 February 2023

Thursday Feb 2, 2023

Every day:

  • Data collection and procedures: based on past day, document build procedures for as-built practice - the part after the 'build procedure' which is theoretical.
  • CAD work - or review existing CAD or if no new CAD exists design a new module. CAD should always reconcile with BOM, so CAD work might mean extracting a spreadsheet of parts. Automate this later with part libraries. See OSE FreeCAD Workbenches
  • Document big picture build procedures (fabrication diagrams) for larger projects, such as for the whole house.