Module Designer: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(3 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
#Example - I1 - | #Example - I1 - | ||
=Floor 1 Process= | |||
coordinate is 'left side top of foundation' at 0,0,0 | |||
#Design Wall Module 1-30 (structure) | |||
#Parameters - wall module type. | |||
##There are n types - corner, reg, door, window, double door | |||
#Add standard electrical outlets (base level design) | |||
##Parameters: number of bay in each module, single-double-triple | |||
##Design Rules - human puts it in by going through a checklist of requirements. | |||
##Requires a concept drawing to meet code (6' requirement) | |||
##Start at Breaker Box Module | |||
#Add Service Devices (breaker, transfer, inverter, etc) | |||
#Add lights | |||
#Add kitchen | |||
#Add heaters | |||
#Add Heat pump | |||
#Add vent fans | |||
#Add plumbing | |||
##Stable. | |||
#Add interior walls | |||
#Add laundry | |||
#Add landing | |||
#Add stairs | |||
#Add closet under stairs | |||
#Add washer | |||
#Add Garage | |||
#Add Garage Railings, siding, carpet | |||
#Add canopy | |||
#Add trellis | |||
#Add PV | |||
=Links= | |||
*[[FreeCAD Module Designer]] |
Latest revision as of 19:37, 8 June 2023
Goal
- Goal - generate blueprints for modules. (in which case the location would not even be needed).
Process
- Design module. Put everything needed in there.
- Apertures, wiring, blocking, plumbing, water, components - this is how we 5x the module build speed.
- Put it in the right location in the house.
- Example - I1 -
Floor 1 Process
coordinate is 'left side top of foundation' at 0,0,0
- Design Wall Module 1-30 (structure)
- Parameters - wall module type.
- There are n types - corner, reg, door, window, double door
- Add standard electrical outlets (base level design)
- Parameters: number of bay in each module, single-double-triple
- Design Rules - human puts it in by going through a checklist of requirements.
- Requires a concept drawing to meet code (6' requirement)
- Start at Breaker Box Module
- Add Service Devices (breaker, transfer, inverter, etc)
- Add lights
- Add kitchen
- Add heaters
- Add Heat pump
- Add vent fans
- Add plumbing
- Stable.
- Add interior walls
- Add laundry
- Add landing
- Add stairs
- Add closet under stairs
- Add washer
- Add Garage
- Add Garage Railings, siding, carpet
- Add canopy
- Add trellis
- Add PV