(Created page with "*It's an experiment in defining a model for the deployment rate of scalable activity. *Industry standard: money + proprietary tech; expensive kit, no distributive open source,...") |
No edit summary |
||
Line 6: | Line 6: | ||
**Solar concrete trailer produces lime concrete foundations on gravel with solid geotextiled gravel bed for proper drainage and shallow insulated footer | **Solar concrete trailer produces lime concrete foundations on gravel with solid geotextiled gravel bed for proper drainage and shallow insulated footer | ||
**Lime concrete - 315 tons per year. 315 foundations per acre at [[Farm Yields Per Acre]] | **Lime concrete - 315 tons per year. 315 foundations per acre at [[Farm Yields Per Acre]] | ||
**Rock crusher - makes gravel, all waste is fed into it. |
Revision as of 19:39, 29 August 2023
- It's an experiment in defining a model for the deployment rate of scalable activity.
- Industry standard: money + proprietary tech; expensive kit, no distributive open source, no swarmability becuase nobody does crowd swarming (outside of Habitat)
- 10x lower capital cost on the fabrication of CEB presses, if done at scale. Matters at the 100 CEB level, where each produces 600/hr * 24=14,400 block per day. One house a day.
- 10x lower cost means $500k for block presses
- Solar trailer for rebar welding gives the trusses or solid beam top plates, doable everywhere.
- Solar concrete trailer produces lime concrete foundations on gravel with solid geotextiled gravel bed for proper drainage and shallow insulated footer
- Lime concrete - 315 tons per year. 315 foundations per acre at Farm Yields Per Acre
- Rock crusher - makes gravel, all waste is fed into it.