Nate: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Sep 2, 2023=
Meaningful dent:
*qualified project manager under MJ supervision
*Mechanic, like one of the tank mechanics or such
*OSE Rock crusher + rotary kiln for cement, throughput of 50 homes per year from rubble
*Fischer-Tropf fuel combine - all fuel ready from wood chips or rubble
*Tank burner - grinder and induction furnace for making rebar from scrap steel
*Insulation - blown cellulose or 3d printed
=8/30/23 Possibilities=
*At scale means 10, 100, or 1000 machines.
*Brute-force comfortable housing for the villages, for free. Dignified, and solar roof. 300 kW for a village of 1000 homes.
*Budget: tractor/backhoe /trencher, CEB, sawmill, rock crusher/plastic shredder, filamenter, 3D printer, rotary kiln with panels that later go on roofs, pond liner for living roof package at a yield of 1000 homes a pop.
*Budget for 1000 homes=$10M, or $10k per full house including plumbing/electrical.
*Homes in rural areas are $4-10k - village economy - [https://realting.com/property-for-sale/ukraine/houses?movemap-input=1&slug=property-for-sale&search=Ukraine&Estate%5Bgeo_id%5D=241&Estate%5Bcurrency%5D=EUR&Estate%5BtypeIds%5D%5B30%5D=30&Estate%5Bzoom%5D=9&Estate%5Bx1%5D=29.7757&Estate%5By1%5D=46.51541&Estate%5Bx2%5D=32.39868&Estate%5By2%5D=48.09826&referrer_id=&sort=-created_at]
*What makes sense? Bottom line: homes are needed. What is the approach to solving housing in the Ukraine?
=8/29/23 notes=
*Requirements - successful pilot
*Requirements - successful pilot
*Agency for Reconstruction proposal
*Agency for Reconstruction proposal
Line 8: Line 27:
*First - buy-in from the Ukes, second, funding
*First - buy-in from the Ukes, second, funding
*Could do housing and corruption at the same time
*Could do housing and corruption at the same time
*Nate may put it in front of some folks

Latest revision as of 23:52, 2 September 2023

Sep 2, 2023

Meaningful dent:

  • qualified project manager under MJ supervision
  • Mechanic, like one of the tank mechanics or such
  • OSE Rock crusher + rotary kiln for cement, throughput of 50 homes per year from rubble
  • Fischer-Tropf fuel combine - all fuel ready from wood chips or rubble
  • Tank burner - grinder and induction furnace for making rebar from scrap steel
  • Insulation - blown cellulose or 3d printed


8/30/23 Possibilities

  • At scale means 10, 100, or 1000 machines.
  • Brute-force comfortable housing for the villages, for free. Dignified, and solar roof. 300 kW for a village of 1000 homes.
  • Budget: tractor/backhoe /trencher, CEB, sawmill, rock crusher/plastic shredder, filamenter, 3D printer, rotary kiln with panels that later go on roofs, pond liner for living roof package at a yield of 1000 homes a pop.
  • Budget for 1000 homes=$10M, or $10k per full house including plumbing/electrical.
  • Homes in rural areas are $4-10k - village economy - [1]
  • What makes sense? Bottom line: homes are needed. What is the approach to solving housing in the Ukraine?

8/29/23 notes

  • Requirements - successful pilot
  • Agency for Reconstruction proposal
  • Modular housing
  • Minister of digital transfo - federov
  • Our value prop is lower cost via modularity and swarm
  • X homes in x days to build some homes - doable
  • Get this in front of some
  • First - buy-in from the Ukes, second, funding
  • Could do housing and corruption at the same time
  • Nate may put it in front of some folks