*{{check}}Solar PV standards and certifications - [https://www.linkedin.com/pulse/introduction-solar-pv-standards-certifications-asif/]. Class II means frames grounded, no system ground. | *{{check}}Solar PV standards and certifications - [https://www.linkedin.com/pulse/introduction-solar-pv-standards-certifications-asif/]. Class II means frames grounded, no system ground. | ||
*Fire safety and personnel safety are typically tradeoffs? [ | *Fire safety and personnel safety are typically tradeoffs? [https://zenodo.org/record/1282867/files/article.pdf] | ||
=Equipment Grounding= | =Equipment Grounding= |
Revision as of 22:53, 15 September 2023
NEC 690 - Covers PV Systems
- 690.41 - Equipment Grounding Conductor requirements [1]
- 690.41(B) also requires ground fault protection except if there are no more than 2 strings (PV source circuits [2])
- Since NEC 2020, ground fault indicator must be readily visible (but not necessarily readily accessible?) [3]
- 690.45 - size of PV equipment grounding conductors - Table 250.122 + no less than 14 ga.
- 690.41(B) also requires ground fault protection except if there are no more than 2 strings (PV source circuits [2])
- 690.9(A) says that we don't need overcurrent device for PV if the wires can handle short current capacity of PV. But good luck trying to convince a code official.
- PV Grounding PDF [4]. Although the NEC does not specifically require all equipment to be certified/listed, many local jurisdictions and many AHJs establish requirements that all equipment be certified/listed because they feel unqualified to examine uncertified/unlisted equipment for safety as the NEC requires.
- Good overview doc. Read it from p. 6 on to understand equipment ground, system ground.
- Additional issue for PV is that in cloudy conditions, if you get a fault, a breaker may not trip because current is too low. For this reason, extra ground fault protection devices may be required.
More
Solar PV standards and certifications - [5]. Class II means frames grounded, no system ground.
- Fire safety and personnel safety are typically tradeoffs? [6]
Equipment Grounding
- PV panels should follow electrical grounding conductor sizes - [7]
- Ie, for 30A DC, we need 10 ga ground.
- PV frames must be connected to PV system equipment grounding conductor [8]
- After leaving the PV array, the equipment ground must run together with the power wires. [9]
What Size Grounding Conductor on PV Panels?
- Australia rules - appear to say 6 ga for lightning protection, and 12 ga for frame grounding [10]
- 6 ga USA if 'subject to damage'?