Cost Comparison to Industry Standards: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 1: Line 1:
=Common Machines=
=Common Machines=
*Backhoe - $75k start for [[Terex TLB840R]] at 74 hp
*Backhoe - $75k start for [[Terex TLB840R]] at 74 hp, but their 94 hp starts at $54k.


=Radical=
=Radical=

Revision as of 18:47, 29 September 2023

Common Machines

  • Backhoe - $75k start for Terex TLB840R at 74 hp, but their 94 hp starts at $54k.

Radical

When deployed as full product ecologies (construction set product ecosystem with Deep Modularity) - then the savings is 10x. Combined with lifetime design (open design, high level of part Degeneracy, Design for Disassembly, simple part sourcing, Robust Design - then savings are 10x value increase by 10x life extension. Thus, 1% the cost of industry standards.

Qualitative Tractor Manufacturing Cost Comparison

Ptm.jpg

See also: http://phibetaiota.net/2017/03/marcin-jakubowskiosee-10-20-percent/

Analysis from 2011

https://docs.google.com/spreadsheet/ccc?key=0Aj7WbjRT9mlmdE12c0o1T2FjeFhzYmRKLUthaVVUbEE&hl=en_US#gid=1

Links