=Data Points=
*450A MIG with 1/16" wire gets 17 lb/hr. [https://www.esabna.com/euweb/awtc/lesson9_13.htm]
*450A MIG with 1/16" wire gets 17 lb/hr. [https://www.esabna.com/euweb/awtc/lesson9_13.htm]
*Submerged arc welding is limited to flat horiz surfaces due to need to cover with flux, but gets 40 PPH rate (Pounds Per Hour) [https://www.thefabricator.com/thewelder/article/arcwelding/improving-deposition-rates-with-submerged-arc-welding]
*This gets us to make about 1-2 heavy duty sprockets for tractor drive
*This gets us to make about 1-2 heavy duty sprockets for tractor drive
*This gets us know into fesibility of [[MIG Casting]] engine blocks.
*This gets us know into fesibility of [[MIG Casting]] engine blocks.
Line 7: Line 9:
*With 5 welders and 50kW - we have 80 lb/hour deposition rate of finished parts.
*With 5 welders and 50kW - we have 80 lb/hour deposition rate of finished parts.
*This lends itself to robot arm automation in due time.
*This lends itself to robot arm automation in due time.
=Calculations=
*The above indicates 6 cents/lb metal energy cost for deposition with a 450A welder.
=Links=
*[[GMAW Deposition Rate]]
*[[Weld Deposition Rate]]
*[[Welder Deposition Rate]]

Latest revision as of 01:17, 22 November 2023

Data Points

  • 450A MIG with 1/16" wire gets 17 lb/hr. [1]
  • Submerged arc welding is limited to flat horiz surfaces due to need to cover with flux, but gets 40 PPH rate (Pounds Per Hour) [2]
  • This gets us to make about 1-2 heavy duty sprockets for tractor drive
  • This gets us know into fesibility of MIG Casting engine blocks.
  • This is a low skill process, allowing further opportunity in Extreme Manufacturing starting with scrap steel. This upgrades the need for wire drawing to produce welding wire.
  • Disadvantage: this requires 2x the energy over casting or hot rolling - because an extra step is needed to melt the feedstock fully. Quenching in water can possibly reclaim energy of water for space heating.
  • Using multiple welders at the same time in the Extreme Manufacturing scenario allows for the quickest way to cast complexity - 5 minutes per 1 lb part such as a small coupler. This is the amount of time to just turn on an induction furnace for regular casting.
  • With 5 welders and 50kW - we have 80 lb/hour deposition rate of finished parts.
  • This lends itself to robot arm automation in due time.

Calculations

  • The above indicates 6 cents/lb metal energy cost for deposition with a 450A welder.