Drywall Finishing: Difference between revisions
Jump to navigation
Jump to search
(→Time) |
(Added some more Categories to the page) |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Hint|Finishing takes as long as handing, but costs indicate that it is about 2x times the labor of hanging. Hanging is just 1/3 the job. There are different levels of finish. Level 0 is unfinished. Used in some places where looks are not important.}} | |||
=Good= | |||
*How to hang drywall [https://www.youtube.com/watch?v=laF34taUp1A] | *How to hang drywall [https://www.youtube.com/watch?v=laF34taUp1A] | ||
*Tape and mud video [https://www.youtube.com/watch?v=0F_RDQSJtAk]. Corner strip. 3 coats of mud over every edge or screw. Taping. Corners. Bulk sanding. Edge sanding. Ready to paint. Wow, lots of work. | *Tape and mud video [https://www.youtube.com/watch?v=0F_RDQSJtAk]. Corner strip. 3 coats of mud over every edge or screw. Taping. Corners. Bulk sanding. Edge sanding. Ready to paint. Wow, lots of work. | ||
*How to | *[[How to Mask]] | ||
*Power roller video - [https://www.youtube.com/watch?v=b1YaCI3NyTg] | *Power roller video - [https://www.youtube.com/watch?v=b1YaCI3NyTg] | ||
Line 17: | Line 21: | ||
**8800 sf*$1.5 = $14k or so in labor. | **8800 sf*$1.5 = $14k or so in labor. | ||
**SEH - about 180 BB sheets? | **SEH - about 180 BB sheets? | ||
=Internal Links= | |||
*[[Drywall Finish Levels]] | |||
[[Category: Drywall]] [[Category: Housing and construction]] |
Latest revision as of 14:33, 24 July 2024
Hint: Finishing takes as long as handing, but costs indicate that it is about 2x times the labor of hanging. Hanging is just 1/3 the job. There are different levels of finish. Level 0 is unfinished. Used in some places where looks are not important.
Good
- How to hang drywall [1]
- Tape and mud video [2]. Corner strip. 3 coats of mud over every edge or screw. Taping. Corners. Bulk sanding. Edge sanding. Ready to paint. Wow, lots of work.
- Power roller video - [3]
Time
- Forbes Home details [4]
- One wall in a day -[5]. 5 hours for a wall with many penetrations.
- 7 poeple, 4 days, 1000 sf - 224 hours [6]
- 144 hrs 1000 sf [7]
- Amateur takes 2400 hours for 3000 sf house [8]
- 250-300 sheets with 2 man crew in 8-9 days [9], about half to hang and half to finish.
- 16 sheets per person per day. 1/2 hr per sheet total.
- 8800 sf*$1.5 = $14k or so in labor.
- SEH - about 180 BB sheets?