SEH 4 Final Coat Procedure: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*Observe subfloor joists. Sand or caulk any final defects. *310 shellac the bottom edges where meeded") |
No edit summary |
||
Line 1: | Line 1: | ||
*Observe subfloor joists. Sand or caulk any final defects. | *Observe subfloor joists. Sand or caulk any final defects. | ||
*310 shellac the bottom edges where | *310 shellac the bottom edges where needed | ||
*45 degree shellac 515 into corners | |||
*Right angle to subfloor | |||
*Right angle to bottom vertical of joists. | |||
Thus |
Revision as of 20:37, 15 September 2024
- Observe subfloor joists. Sand or caulk any final defects.
- 310 shellac the bottom edges where needed
- 45 degree shellac 515 into corners
- Right angle to subfloor
- Right angle to bottom vertical of joists.
Thus