CEB Press Fabrication Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 9: Line 9:
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)


=Frame, Drawer, Cylinder Mount=
=Cut All Metal=
#Build Frame
 
##Document step by step. Old instructions from all previous builds are still relevant, older documentation should be mined for whatever exists on the wiki, as most of the procedure is already captured.
'''Build Frame'''
*Document step by step. Old instructions from all previous builds are still relevant, older documentation should be mined for whatever exists on the wiki, as most of the procedure is already captured.
 
1. Cut 10 pieces of [[7/16"x6" heavu u-channel]] (this link should be filled with (1) a technical drawing from a library of any professional CAD package); (2) a real picture of the material, (3) a real picture or video of someone cutting it (all of: abrasive, cold cut, band, plasma, or oxy torch)
*[4] 21" long
*[2] 29" long
*[2] 10" long (compression chamber spacers
 
2.
 




[[Category:CEB Press Documentation]]
[[Category:CEB Press Documentation]]

Revision as of 20:30, 6 June 2011

Fabrication Procedure

  1. Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
    1. Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
  2. Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
    1. Stock steel (pictures from first build are desirable here)
    2. CEB Hydrauilics Order (complete lists already documented on wiki, need to be organized on this new page)
    3. Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)

Cut All Metal

Build Frame

  • Document step by step. Old instructions from all previous builds are still relevant, older documentation should be mined for whatever exists on the wiki, as most of the procedure is already captured.

1. Cut 10 pieces of 7/16"x6" heavu u-channel (this link should be filled with (1) a technical drawing from a library of any professional CAD package); (2) a real picture of the material, (3) a real picture or video of someone cutting it (all of: abrasive, cold cut, band, plasma, or oxy torch)

  • [4] 21" long
  • [2] 29" long
  • [2] 10" long (compression chamber spacers

2.