CEB Press Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
Line 30: | Line 30: | ||
*[2x3] 1/4"x2" angle, 21" long - hopper closure | *[2x3] 1/4"x2" angle, 21" long - hopper closure | ||
*[2x3] 1/4"x2" | *[2x3] 1/4"x2" angle - 7" long - hopper closure tab for cylinder alignment | ||
*[2x3] | |||
Line 43: | Line 44: | ||
* - hopper interface plate | * - hopper interface plate | ||
* - | *[2x3] 3/4" pipe, 1" long - cylinder aligner | ||
*[2x3] u-channel, 3" - cylinder align | |||
=Secure All Fasteners= | |||
*[2x3] 1/2"x2" - cylinder alignment | |||
*[4x3] 1/2: nuts - cylinder alignment | |||
*[2x3] 3/4"x6" threaded rod - cylinder align | |||
*[6x3] 3/4" nuts - cylinder align | |||
=Punch All Holes= | =Punch All Holes= |
Revision as of 04:53, 8 June 2011
Preparation
- Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
- Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
- Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
- Stock steel (pictures from first build are desirable here)
- CEB Hydrauilics Order (complete lists already documented on wiki, need to be organized on this new page)
- Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
- Prepare all consumables
- Purchase outstanding itens
- 2 more main cylinders
- Power Beyond Fittings for tractor valves
Cut All Metal (Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch)
(note: second number in brackets is the number of copies required)
Cut 10 pieces of 7/16"x6" heavy u-channel (this link should be filled with (1) a technical drawing from a library of any professional CAD package); (2) a real picture of the material, (3) a real picture or video of someone cutting it (all of: abrasive, cold cut, band, plasma, or oxy torch)
- [4x3] 21" long - top and bottom of frame
- [2x3] 29" long - mid of frame
- [2x3] 10" long - compression chamber spacers
- [2] 42" long - frame sides - see Note on CEB Frame Height
- [2x2] 44" long - frame sides - see Note on CEB Frame Height
- [4x3] 6' long - arms
- [4x3] 4' long - legs
- [4x3] 6" long - 2.5"x3/16" square tubing - feet tubes
- [4x3] 10"x10"x1/4" flats - feet
- [2x3] 1/4"x2" angle, 21" long - hopper closure
- [2x3] 1/4"x2" angle - 7" long - hopper closure tab for cylinder alignment
- [2x3]
- - drawer
- - hopper
- - hopper supports
- - shaker
- - hopper interface plate
- [2x3] 3/4" pipe, 1" long - cylinder aligner
- [2x3] u-channel, 3" - cylinder align
Secure All Fasteners
- [2x3] 1/2"x2" - cylinder alignment
- [4x3] 1/2: nuts - cylinder alignment
- [2x3] 3/4"x6" threaded rod - cylinder align
- [6x3] 3/4" nuts - cylinder align