OSE Botswana: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
=='''OSE Botswana Plan'''==
=2025=
[[Africa Budget]], [[Africa Pilot]], Citizen Entrepreneurial Development Agency (CEDA)[https://www.ceda.co.bw/], Local Enterprise Authority (LEA)[http://www.lea.co.bw/]
*See LinkedIn - [https://www.linkedin.com/feed/update/urn:li:activity:7355527644966268930/?commentUrn=urn%3Ali%3Acomment%3A%28activity%3A7355527644966268930%2C7356510758421082112%29&dashCommentUrn=urn%3Ali%3Afsd_comment%3A%287356510758421082112%2Curn%3Ali%3Aactivity%3A7355527644966268930%29]
 
=OSE Botswana Plan=
[[Africa Budget]], [[Africa Pilot]], Citizen Entrepreneurial Development Agency (CEDA)[https://www.ceda.co.bw/], Local Enterprise Authority (LEA)[http://www.lea.co.bw/] for funding. 
 
=Business Plan Draft=
 
https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit
 
=Land Allocation=
Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA)
Sample certificate of one of the plots of land allocated to Makunga Family members: [[File:Certificate of Customary Land Grant.pdf]]


----
----
=='''Land Allocation'''==
 
Approximately 80 hectares (200 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA)
=OSE Microfactory and Campus Botswana=
Planning:
* need water - borehole?
* Power - Generator to power welders
* Foundation Slab - for workshop: 15m x 20m with roof.
* CEB press parts
* Toilets and showers
1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins.
Need Site plan.
CEB house plans, dorms and cabin plans.
Bus in casual labourers to build infrastructure.
Fly in MJ & CM for CEB build and other machines for workshop.
 
[[Category: OSE Botswana]]

Latest revision as of 21:56, 6 August 2025

2025

  • See LinkedIn - [1]

OSE Botswana Plan

Africa Budget, Africa Pilot, Citizen Entrepreneurial Development Agency (CEDA)[2], Local Enterprise Authority (LEA)[3] for funding.

Business Plan Draft

https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit

Land Allocation

Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) Sample certificate of one of the plots of land allocated to Makunga Family members: File:Certificate of Customary Land Grant.pdf


OSE Microfactory and Campus Botswana

Planning:

  • need water - borehole?
  • Power - Generator to power welders
  • Foundation Slab - for workshop: 15m x 20m with roof.
  • CEB press parts
  • Toilets and showers

1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins. Need Site plan. CEB house plans, dorms and cabin plans. Bus in casual labourers to build infrastructure. Fly in MJ & CM for CEB build and other machines for workshop.