Max Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| Line 1: | Line 1: | ||
=Build Pictures= | =Build Pictures= | ||
* | *Upload - [https://wiki.opensourceecology.org/index.php?title=Special:Upload&wpDestFile=Upload] | ||
=Time Log= | =Time Log= | ||
| Line 6: | Line 6: | ||
{{Timelog|Max2}} | {{Timelog|Max2}} | ||
=Tue Oct 28, 2025= | |||
Morning: 10:05am-12:45pm | |||
* Installed 2nd sliding door handle/lock and adjusted roller (~5min total) | |||
* Put up R38 fiberglass insulation into the ceiling, covered about 5 rows | |||
Lunch: 12:45pm- | |||
Afternoon: | |||
=Mon Oct 27, 2025= | =Mon Oct 27, 2025= | ||
Morning: 10:05-2:30 | |||
* Helped attach roof rafter braces | * Helped attach roof rafter braces | ||
* Started attaching some PV panels | |||
Lunch: 2:30-3:30 | |||
Afternoon: 3:30-6:20 | |||
* Measured out PV spacing on most runners | * Measured out PV spacing on most runners | ||
| Line 19: | Line 37: | ||
* Finished installing first row of PV panels | * Finished installing first row of PV panels | ||
Spent 2h after work learning/trying out FreeCAD 1.0 | |||
Evening (non-work): | |||
* Spent 2h after work learning/trying out FreeCAD 1.0 | |||
Revision as of 18:12, 28 October 2025
Build Pictures
- Upload - [1]
Time Log
Write down morning work done, lunch time, and afternoon work done.
Tue Oct 28, 2025
Morning: 10:05am-12:45pm
- Installed 2nd sliding door handle/lock and adjusted roller (~5min total)
- Put up R38 fiberglass insulation into the ceiling, covered about 5 rows
Lunch: 12:45pm-
Afternoon:
Mon Oct 27, 2025
Morning: 10:05-2:30
- Helped attach roof rafter braces
- Started attaching some PV panels
Lunch: 2:30-3:30
Afternoon: 3:30-6:20
- Measured out PV spacing on most runners
- Attached front PV mounts on most runners
- Finished installing first row of PV panels
Evening (non-work):
- Spent 2h after work learning/trying out FreeCAD 1.0