CEB Press Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 12: | Line 12: | ||
##Power Beyond Fittings for tractor valves | ##Power Beyond Fittings for tractor valves | ||
=[[Cut CEB Metal]] | =[[Cut CEB Metal]] | ||
=Secure | *Methods: Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch | ||
=Secure CEB Fasteners= | |||
*[2] 1/2"x2" - cylinder alignment | *[2] 1/2"x2" - cylinder alignment | ||
*[4] 1/2: nuts - cylinder alignment | *[4] 1/2: nuts - cylinder alignment |
Revision as of 23:11, 3 July 2011
Preparation
- Prepare all required tools and workspace
- Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
- Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
- Stock steel (pictures from first build are desirable here)
- CEB Hydrauilics Order (complete lists already documented on wiki, need to be organized on this new page)
- Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
- Prepare all consumables
- Purchase outstanding itens
- 2 more main cylinders
- Power Beyond Fittings for tractor valves
- Methods: Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch
Secure CEB Fasteners
- [2] 1/2"x2" - cylinder alignment
- [4] 1/2: nuts - cylinder alignment
- [2] 3/4"x6" threaded rod - cylinder align
- [6] 3/4" nuts - cylinder align
- [4] 3/4" nuts - arms to frame attachment