CEB Press Fabrication Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(30 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{under construction}}
=Preparation=


=Fabrication Procedure=
#Prepare all required tools and workspace
 
#Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
##Stock steel (pictures from first build are desirable here)
##Stock steel (pictures from first build are desirable here)
##Hydrauilics (complete lists already documented on wiki, need to be organized)
##[[CEB Hydrauilics Order]] (complete lists already documented on wiki, need to be organized on this new page)
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)




=Frame, Drawer, Cylinder Mount=
 
#Build Frame
=[[Cut CEB Metal]]=
##Document step by step. Old instructions are still relevant, older documentation should be mined.
 
*Methods: Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch
 
=Secure CEB Fasteners=
*[2] 1/2"x2" - cylinder alignment
*[4] 1/2: nuts - cylinder alignment
*[2] 3/4"x6" threaded rod - cylinder align
*[6] 3/4" nuts - cylinder align
*[4] 3/4" nuts - arms to frame attachment
 
=[[Punch CEB Holes]]=
 
=Grind CEB Metal=
 
=Weld All Assemblies=
 
=Prepare all other Assemblies (Sensors, Controller)=
==[[Sensor Fabrication]]==
==[[Sensor Assembly Fabrication]]==
==[[Controller Fabrication]]==
 
=Bolt Entire Machine Together=
 
=Upload Control Code, Dry Test, and Field Test=
 
[[Category:CEB Press Documentation]]
[[Category:CEB Press Fabrication]]

Latest revision as of 23:13, 3 July 2011

Preparation

  1. Prepare all required tools and workspace
    1. Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
  2. Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
    1. Stock steel (pictures from first build are desirable here)
    2. CEB Hydrauilics Order (complete lists already documented on wiki, need to be organized on this new page)
    3. Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)


Cut CEB Metal

  • Methods: Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch

Secure CEB Fasteners

  • [2] 1/2"x2" - cylinder alignment
  • [4] 1/2: nuts - cylinder alignment
  • [2] 3/4"x6" threaded rod - cylinder align
  • [6] 3/4" nuts - cylinder align
  • [4] 3/4" nuts - arms to frame attachment

Punch CEB Holes

Grind CEB Metal

Weld All Assemblies

Prepare all other Assemblies (Sensors, Controller)

Sensor Fabrication

Sensor Assembly Fabrication

Controller Fabrication

Bolt Entire Machine Together

Upload Control Code, Dry Test, and Field Test