CEB Press Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(25 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Preparation= | |||
#Prepare all required tools and workspace | |||
#Prepare all required tools | |||
##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines) | ##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines) | ||
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this) | #Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this) | ||
Line 9: | Line 8: | ||
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added) | ##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added) | ||
=[[Cut CEB Metal]]= | |||
*[4 | |||
*[ | *Methods: Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch | ||
*[ | |||
=Secure CEB Fasteners= | |||
*[2] 1/2"x2" - cylinder alignment | |||
*[4] 1/2: nuts - cylinder alignment | |||
*[2] 3/4"x6" threaded rod - cylinder align | |||
*[6] 3/4" nuts - cylinder align | |||
*[4] 3/4" nuts - arms to frame attachment | |||
=[[Punch CEB Holes]]= | |||
=Grind CEB Metal= | |||
=Weld All Assemblies= | |||
=Prepare all other Assemblies (Sensors, Controller)= | |||
==[[Sensor Fabrication]]== | |||
==[[Sensor Assembly Fabrication]]== | |||
==[[Controller Fabrication]]== | |||
=Bolt Entire Machine Together= | |||
=Upload Control Code, Dry Test, and Field Test= | |||
[[Category:CEB Press Documentation]] | [[Category:CEB Press Documentation]] | ||
[[Category:CEB Press Fabrication]] |
Latest revision as of 23:13, 3 July 2011
Preparation
- Prepare all required tools and workspace
- Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
- Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
- Stock steel (pictures from first build are desirable here)
- CEB Hydrauilics Order (complete lists already documented on wiki, need to be organized on this new page)
- Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
Cut CEB Metal
- Methods: Abrasive, Torch, Cold Cut, Ironworker, Bandsaw, Plasma Cutter, Oxy Torch
Secure CEB Fasteners
- [2] 1/2"x2" - cylinder alignment
- [4] 1/2: nuts - cylinder alignment
- [2] 3/4"x6" threaded rod - cylinder align
- [6] 3/4" nuts - cylinder align
- [4] 3/4" nuts - arms to frame attachment