(Created page with "This is a log tracking my (Brianna Kufa's) progress at Factor E Farm === August 21, 2011=== Today I started the log and recorded what I've done here in the past couple of days. ...")
 
Line 12: Line 12:


=== August 19, 2011===  
=== August 19, 2011===  
*I finished the two frame/cylinder components of two of the 4 CEB presses I am building [[Image:meandceb.jpg|thumb|350px]]. These are ready to be erected (meaning adding arms, legs, hopper assemblies).
*I finished the two frame/cylinder components of two of the 4 CEB presses I am building [[Image:Meandceb.jpg|thumb|350px]]. These are ready to be erected (meaning adding arms, legs, hopper assemblies).
*I began welding the cylinder to the press foot on the fourth CEB. See [[Frame with main cylinder]]. I took some time to square it up perfectly, so that the plate is perpendicular to the cylinder in all directions. [[Image:squarepressfoot|thumb|250px]]
*I began welding the cylinder to the press foot on the fourth CEB. See [[Frame with main cylinder]]. I took some time to square it up perfectly, so that the plate is perpendicular to the cylinder in all directions. [[Image:Squarepressfoot.jpg|thumb|250px]]


=== August 15. 2011 ===
=== August 15. 2011 ===
*I made the [[Life Track Trailer Ball Quick Attach]].
*I made the [[Life Track Trailer Ball Quick Attach]].
*I finished attaching the [[Three Point Adapter Quick Attach]].
*I finished attaching the [[Three Point Adapter Quick Attach]].

Revision as of 21:21, 21 August 2011

This is a log tracking my (Brianna Kufa's) progress at Factor E Farm

August 21, 2011

Today I started the log and recorded what I've done here in the past couple of days.

  • I updated the Soil Loading Drawer page fabrication instructions to make it the most modern version.

August 20, 2011

  • I finished welding the cylinder to the press foot on the back side.
  • I began making the Soil Loading Drawer for the 4th press. This proved to be a little frustrating as the metal we ordered all was about an inch longer than how we ordered it, so I had to make nearly twice as many cuts to prepare them.
  • I helped Marcin raise the roof for the new workplace. We stayed up till 4am raising it inch by inch with a farm jack. We screwed in tall 2x4's to hold it in place as we were lifting it.


August 19, 2011

  • I finished the two frame/cylinder components of two of the 4 CEB presses I am building
    Meandceb.jpg
    . These are ready to be erected (meaning adding arms, legs, hopper assemblies).
  • I began welding the cylinder to the press foot on the fourth CEB. See Frame with main cylinder. I took some time to square it up perfectly, so that the plate is perpendicular to the cylinder in all directions.
    Squarepressfoot.jpg

August 15. 2011