Brianna Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 16: | Line 16: | ||
*I began welding the cylinder to the press foot on the fourth CEB. See [[Frame with main cylinder]]. I took some time to square it up perfectly, so that the plate is perpendicular to the cylinder in all directions. | *I began welding the cylinder to the press foot on the fourth CEB. See [[Frame with main cylinder]]. I took some time to square it up perfectly, so that the plate is perpendicular to the cylinder in all directions. | ||
</ | <br/> | ||
=== August 15. 2011 === | === August 15. 2011 === | ||
*I made the [[Life Track Trailer Ball Quick Attach]].[[Image:ballattached.jpg|thumb|200px|The Trailer Ball Quick Attach]] | *I made the [[Life Track Trailer Ball Quick Attach]].[[Image:ballattached.jpg|thumb|200px|The Trailer Ball Quick Attach]] | ||
*I finished attaching the [[Three Point Adapter Quick Attach]]. | *I finished attaching the [[Three Point Adapter Quick Attach]]. |
Revision as of 22:43, 21 August 2011
This is a log tracking my (Brianna Kufa's) progress at Factor E Farm
August 21, 2011
Today I started the log and recorded what I've done here in the past couple of days.
- I updated the Soil Loading Drawer page fabrication instructions to make it the most modern version.
August 20, 2011
- I finished welding the cylinder to the press foot on the back side.
- I began making the Soil Loading Drawer for the 4th press. This proved to be a little frustrating as the metal we ordered all was about an inch longer than how we ordered it, so I had to make nearly twice as many cuts to prepare them.
- I helped Marcin raise the roof for the new workplace. We stayed up till 4am raising it inch by inch with a farm jack. We screwed in tall 2x4's to hold it in place as we were lifting it.
August 19, 2011
- I finished the two frame/cylinder components of two of the 4 CEB presses I am building . These are ready to be erected (meaning adding arms, legs, hopper assemblies).
- I began welding the cylinder to the press foot on the fourth CEB. See Frame with main cylinder. I took some time to square it up perfectly, so that the plate is perpendicular to the cylinder in all directions.
August 15. 2011
- I made the Life Track Trailer Ball Quick Attach.
- I finished attaching the Three Point Adapter Quick Attach.