Marcin Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
=9/ | =9/30/11= | ||
* Column foundation forms - a laser level would be useful that sense out an array of lines across the whole field so that we don't have to mess with the water level. | * Column foundation forms - a laser level would be useful that sense out an array of lines across the whole field so that we don't have to mess with the water level. | ||
<html><iframe width="300" height="203" src="https://www.youtube.com/embed//RXLGxzXTfCs" frameborder="0" allowfullscreen></iframe></html> | <html><iframe width="300" height="203" src="https://www.youtube.com/embed//RXLGxzXTfCs" frameborder="0" allowfullscreen></iframe></html> |
Revision as of 21:16, 7 October 2011
Archive
9/30/11
- Column foundation forms - a laser level would be useful that sense out an array of lines across the whole field so that we don't have to mess with the water level.
- Hammering Foundation pads - http://www.youtube.com/watch?v=pfcSDbkpJEw
9/28/11
Excavation started |
Gravel trucks and spreading |
Excavation |
Bulldozing |
- $60k construction grant is in
- CEB vault prototype 1 and 2
- Cat D7 bulldozer fuel consumption - 10 gal/hr, 90 gal fuel tank
- Monday midnight oil update - shipping 2 Power Cubes, Bulldozer came.