Marcin Log/2011-08
August 18, 2011
- Today I gave a speech at TEDxKC
August 19, 2011
- Visited an industry standard Dimensional Sawmill with Brian Sweiger - we are having Sweiger Shop fabricate Prototype 1.
- Discussed Kickstarter with Isaiah and Found Alexander Lieders and Antoine Malouin to work with Isaiah on graphics
August 20, 2011
- Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
- Felled large walnut to clear workshop space

August 21
- 10 to 4 tieing down new covered space.
- Started Overall_Budget and published Kauffman Proposal
August 22
- 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
- Found that construction funding should be in within 48 hours
August 23
- Had design meeting on Dimensional Sawmill with Doug of Sweiger Shop
- Determined 'followthrough' and 'substance creation' as some of the core values for the FeF
August 24
- Troubleshooted and shot documentation on B&S Magnetos - to put in replacements
- Contacted Jose Bravo on joining the Factor e Team
<html> <iframe width="210" height="170" src="https://www.youtube.com/embed//RtyJj6GkKoA" frameborder="0" allowfullscreen></iframe> </html>
- Updated CNC_Torch_Table#OSE_Project_Status.2FSchedule
- Updated CAD-CAM Problem Statement with discussion from Kevin Atkinson
- Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point
- Filled in images at CEB_Press/Manufacturing_Instructions/Controller_Box#Wiring_Instructions
- Tom's Final Supper:
<html> <iframe width="210" height="170" src="https://www.youtube.com/embed//wVlcPzKh1D4" frameborder="0" allowfullscreen></iframe> <iframe width="210" height="170" src="https://www.youtube.com/embed//uECAeUE70MI" frameborder="0" allowfullscreen></iframe> <iframe width="210" height="170" src="https://www.youtube.com/embed//RgDAge0ocKw" frameborder="0" allowfullscreen></iframe> </html>
- Documented control code testing procedure for CEB press initial run - CEB_Control_Source_Code_v1.0_Explained
August 25
- Defined Instructionals To Do List and requested a comparable list from William Neal
- Spent an hour in Team Development coaching from SupporTED
- Spent an hour with Jershonda Baker defining Multimachine Deployment Strategy
- Spent 4 hours on controller code testing; issue with sensors not picking up signal
August 26
- Submitted Senior TED Fellows application for review
- Tested automated motion of secondary cylinder on CEB press.
- Set up Shonda to bend tracks for tractor; streamlined to 3 per minute:
<html><iframe width="280" height="170" src="https://www.youtube.com/embed//G97cN4cVD1E" frameborder="0" allowfullscreen></iframe></html>
August 27
- Tested secondary cylinder - see procedure. Result:
<html><iframe width="210" height="170" src="https://www.youtube.com/embed//99HELZe8s8Y" frameborder="0" allowfullscreen></iframe></html>
- Got up at the crack of dawn to write Factor e Farm Participation Standards after beginning group discussions on self-assessment and priorities toward a shared promise
August 28
- Moved CEB presses to new workshop area and installed arms on one
- Published first draft of GVCS Rollout Plan - general budget for GVCS deployment from now to completion.
August 29
- Published main cylinder wiring and testing procedure -CEB_Press/Manufacturing_Instructions/Control_Source_Code_v1.0_Explained#Main_Cylinder
- Identified Enniss Inc as subject mater experts with design experience of ironworker machines and well drilling rigs
- Assisted on press foot fitting, setup of new welder; track chain size is incorrect and doesn't fit track welding jig - need to replace chain.
- Shook down $60k donation - arriving this Thursday, and Kauffman Foundation will decide their grant on Sept. 13. Discussed this with Logan of TED Fellows program.
August 30
- Published sawmill industry standard study video:
<html><object width="400" height="233"><param name="allowfullscreen" value="true" /><param name="allowscriptaccess" value="always" /><param name="movie" value="http://vimeo.com/moogaloop.swf?clip_id=28369397&server=vimeo.com&show_title=1&show_byline=1&show_portrait=1&color=00adef&fullscreen=1&autoplay=0&loop=0" /><embed src="http://vimeo.com/moogaloop.swf?clip_id=28369397&server=vimeo.com&show_title=1&show_byline=1&show_portrait=1&color=00adef&fullscreen=1&autoplay=0&loop=0" type="application/x-shockwave-flash" allowfullscreen="true" allowscriptaccess="always" width="400" height="233"></embed></object>
<a href="http://vimeo.com/28369397">Dimensional Sawmill in Missouri</a> from <a href="http://vimeo.com/user2016419">Open Source Ecology</a> on <a href="http://vimeo.com">Vimeo</a>.
</html>
- Wrote preliminary resource developer contract for Jerome Knapp.
August 31
- Published Proposal Template
- Cut materials for 4 hydraulic reservoirs and 4 fuel tanks for Power Cubes
- Picked up car from transmission repair; transmission went out again after 30 minutes
- Published Hydraulic Tank Bung Cleaning Ergonomic Analysis: it takes 2.5 minutes to clean a bung.
<html> <iframe width="280" height="170" src="https://www.youtube.com/embed//nfr2kZp8vGQ" frameborder="0" allowfullscreen></iframe> </html>
September 1, 2011
- Welded 5 hydraulic reservoirs and fuel tanks for Power Cubes
<html><iframe width="210" height="170" src="https://www.youtube.com/embed//Q3Ygs9yk6Ls" frameborder="0" allowfullscreen></iframe></html>.
- Submitted Senior TED Fellows Application
9/2/11
- Late wake from work last night, started day with meeting
<html> <iframe width="210" height="170" src="https://www.youtube.com/embed//KXRuNW7vPZg" frameborder="0" allowfullscreen></iframe> </html>
- Struggled with pinholes on fuel tank welding. Got 2 tanks done of 10.
9/3/11
- Had Matt Droter prepare all hydrauilic fittings for Power Cubes
- Worked on tank pinhole corrections, then Thad Getterman came to contribute his 3/4 Ton F-250 and a large trailer; day over
- William submitted his leak testing video from last year
9/4/11
- Published update to True Fans and Supporters -
<html><iframe src="https://player.vimeo.com/video/28594771" width="400" height="225" frameborder="0"></iframe>
<a href="http://vimeo.com/28594771">Dear True Fans and Supporters</a> from <a href="http://vimeo.com/user2016419">Open Source Ecology</a> on <a href="http://vimeo.com">Vimeo</a>.
</html>
- Responded to Marshall Smith on his DPV
9/5/11
- 3 new True Fans signed up, probably from blog post
- Labor Day Monday. Assessment of last week:
- Didn't get much done on power cubes. Good start on welding, then the balance of system was tricky
- Major pinhole issues
- Motor mounts were not threaded
- Friday and Saturday basically vaporized
- Promises for today:
- Finish tanks in 3 hours
- Assemble 5 power cubes after tanks are complete; parts should be ready
- Week goals:
- 5 Power Cubes done
- CEB presses done, outside of 5th one
- CEB electronics redone and completed on 4 machines with shipment of solenoid drivers from Blair
- Making sure CEB CAD is published for full CAD markup in pro package
9/8/11
- Spawned Construction Recovery Plan
9/9/11
- Brianna's last day, I picked up on Power Cube finishing, including using derelict hydraulic reservoir
9/10/11
<html><iframe width="210" height="170" src="https://www.youtube.com/embed//0SPxJ_FlKHU" frameborder="0" allowfullscreen></iframe> <iframe width="210" height="170" src="https://www.youtube.com/embed//IFS2xkpr_7Q" frameborder="0" allowfullscreen></iframe> <iframe width="210" height="170" src="https://www.youtube.com/embed//KXe6LJB1b-I" frameborder="0" allowfullscreen></iframe> </html>
9/11/11
- Wrote Kickstarter text
9/12/11
- Took soil pulverizer to Sweiger to build 2 more. Ordered one 5' toothbar bucket for LifeTrac. Discussed conversion of LifeTrac mount to Bobcat implements. Sweiger will mount sickle bar on LifeTrac quick attach plate.
<html><iframe width="300" height="255" src="https://www.youtube.com/embed//2TYk80tBIt4" frameborder="0" allowfullscreen></iframe></html>
- Continued on Power Cube finishing - documented engine mount locations, choke and throttle mounts
<html><iframe width="300" height="255" src="https://www.youtube.com/embed//Txjp21Q5vjk" frameborder="0" allowfullscreen></iframe></html>
9/13/11
- Finished Kickstarter, passed on to Isaiah
- Margaret and crew started on stringers for workshop:
<html><iframe width="200" height="180" src="https://www.youtube.com/embed//K9rgJTTZN6I" frameborder="0" allowfullscreen></iframe> </html>
- Sourced blades for Dimensional Sawmill from Mobile Dimenstion Sawmill Company.
- Documented switch location
- Assembly of Power Cubes ongoing:
<html><iframe width="300" height="255" src="https://www.youtube.com/embed//uuXWTjWEgu8" frameborder="0" allowfullscreen></iframe></html>
- Discussed build of power cube - replication ongoing in Texas with Tom Griffing
- Shonda Log is moving on the lathe -
<html><iframe width="300" height="255" src="https://www.youtube.com/embed//-SBdUy3Nn4E" frameborder="0" allowfullscreen></iframe></html>
9/14/11
- Documentation flurry at YouTube - experimental for remote edits later on. 20 vids published on Power Cube - microinstructionals and details
- If somebody sees this, please insert my YouTube vids into the Power Cube Fabrication page, Tom and Chris
- Sample:
<html> <iframe width="300" height="233"src="https://www.youtube.com/embed//_fR7YzHi7GI" frameborder="0" allowfullscreen></iframe></html>
9/15/11
- Finished pump mounting - <html><iframe width="300" height="233" src="https://www.youtube.com/embed//f1DQGNebHvE" frameborder="0" allowfullscreen></iframe></html>
9/16/11
- Finished engine mounts
<html><iframe width="300" height="233" src="https://www.youtube.com/embed//fccVIC35bt4" frameborder="0" allowfullscreen></iframe></html>
9/17/11
- Finished Power cube cooler and fan mounting - http://www.youtube.com/watch?v=cPAfcqurhD4
9/18/11
<html><iframe width="300" height="233" src="https://www.youtube.com/embed//nLVZEQMgDlE" frameborder="0" allowfullscreen></iframe></html>