Talk:CEB 3D Printer: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "Nice animation, but as the wall gets higher, picking up new bricks is a problem. The support lines for the grabber go through the wall in this video. In real life, they would g...")
 
No edit summary
 
Line 1: Line 1:
Nice animation, but as the wall gets higher, picking up new bricks is a problem.  The support lines for the grabber go through the wall in this video.  In real life, they would get caught on the previously built wall.  Naturally, if the support towers were high enough, you could probably get around this.  Alternatively, you need some kind of x-y-z hoist.  [[User:Mjn|Mjn]] 21:37, 7 November 2011 (CET)
Nice animation, but as the wall gets higher, picking up new bricks is a problem.  The support lines for the grabber go through the wall in this video.  In real life, they would get caught on the previously built wall.  Naturally, if the support towers were high enough, you could probably get around this.  Alternatively, you need some kind of x-y-z hoist.  [[User:Mjn|Mjn]] 21:37, 7 November 2011 (CET)
:i wonder if you could use the same design but ad a winch kind of deal that only drops down from the moving thing. --[[User:Dorkmo|Dorkmo]] 23:29, 7 November 2011 (CET)

Latest revision as of 22:29, 7 November 2011

Nice animation, but as the wall gets higher, picking up new bricks is a problem. The support lines for the grabber go through the wall in this video. In real life, they would get caught on the previously built wall. Naturally, if the support towers were high enough, you could probably get around this. Alternatively, you need some kind of x-y-z hoist. Mjn 21:37, 7 November 2011 (CET)

i wonder if you could use the same design but ad a winch kind of deal that only drops down from the moving thing. --Dorkmo 23:29, 7 November 2011 (CET)