(Created page with "=Intro= As a general perspective - 12 projects need to be run in parallel, with a monthly prototyping cycle for 3 prototypes - to deliver the full GVCS by Dec. 21, 2011. There ar...") |
(→Intro) |
||
Line 2: | Line 2: | ||
As a general perspective - 12 projects need to be run in parallel, with a monthly prototyping cycle for 3 prototypes - to deliver the full GVCS by Dec. 21, 2011. There are 355 days left. | As a general perspective - 12 projects need to be run in parallel, with a monthly prototyping cycle for 3 prototypes - to deliver the full GVCS by Dec. 21, 2011. There are 355 days left. | ||
[[Image:CEBhybrid.jpg]] | [[Image:CEBhybrid.jpg]] | ||
=GVCS Milestones and Strategy= |