Status Brief: Difference between revisions
Jump to navigation
Jump to search
(Created page with "The status brief describes the up-to-date status of GVCS 50 Projects, Infrastructure Buildout, Worldwide Collaboration, and If you qualify, w") |
No edit summary |
||
Line 1: | Line 1: | ||
The status brief describes the up-to-date status of GVCS 50 Projects, Infrastructure Buildout, Worldwide Collaboration, and | The status brief describes the up-to-date status of GVCS 50 Projects, Infrastructure Buildout, Worldwide Collaboration, and Organizational aspects of the [[2012 Rollout Plan]]. |
Revision as of 19:55, 18 January 2012
The status brief describes the up-to-date status of GVCS 50 Projects, Infrastructure Buildout, Worldwide Collaboration, and Organizational aspects of the 2012 Rollout Plan.