Simon Walter-Hansen/Log: Difference between revisions
Jump to navigation
Jump to search
(→2012) |
(Feb 18th, 2012 update) |
||
Line 3: | Line 3: | ||
=2012= | =2012= | ||
==Februrary== | ==Februrary== | ||
===18th=== | |||
* Added timeline for completion of DVD v0.01 to [[Task_List_for_the_Civilization_Starter_Kit_DVD_v0.01|CSK Task List]] | |||
* Emailed [[Aaron_Makaruk]] Re: Collaboration on Re-structuring wiki (CC: Mia Van Meter) | |||
* Emailed [[Aaron_Tarfman]] Re: Generating fabrication drawings from CAD files. Response: Has capability and availability. Awaiting go ahead on Tractor and Power Cube. | |||
* Emailed Larry_Dobson (lad@fundamentalform.com) re: Gasifier Burner Documentation | |||
* Added timeline for meeting needs to [[Task_List_for_the_Civilization_Starter_Kit_DVD_v0.01|CSK Task List]] | |||
* Added DVD v0.01 needs to [[Task_List_for_the_Civilization_Starter_Kit_DVD_v0.01|CSK Task List]] | |||
* Skyped with Marcin regarding DVD v0.01 progress, proposal for completion, wiki organization, locating CAD contributors, CiviCRM | |||
===17th=== | ===17th=== | ||
* Visited [http://adxportland.com ADX Portland] as potential prototyping/fabrication space | * Visited [http://adxportland.com ADX Portland] as potential prototyping/fabrication space | ||
Line 8: | Line 16: | ||
* Emailed contributors for unfinished DVD content | * Emailed contributors for unfinished DVD content | ||
===15th=== | ===15th=== | ||
* Created Log page to track my OSE involvement | * Created [[Simon_Walter-Hansen|Log]] page to track my OSE involvement | ||
* Organizing CSK v0.01 wiki pages | * Organizing CSK v0.01 wiki pages | ||
===14th=== | ===14th=== |
Revision as of 03:38, 19 February 2012
Daily tracking of my involvement at OSE
2012
Februrary
18th
- Added timeline for completion of DVD v0.01 to CSK Task List
- Emailed Aaron_Makaruk Re: Collaboration on Re-structuring wiki (CC: Mia Van Meter)
- Emailed Aaron_Tarfman Re: Generating fabrication drawings from CAD files. Response: Has capability and availability. Awaiting go ahead on Tractor and Power Cube.
- Emailed Larry_Dobson (lad@fundamentalform.com) re: Gasifier Burner Documentation
- Added timeline for meeting needs to CSK Task List
- Added DVD v0.01 needs to CSK Task List
- Skyped with Marcin regarding DVD v0.01 progress, proposal for completion, wiki organization, locating CAD contributors, CiviCRM
17th
- Visited ADX Portland as potential prototyping/fabrication space
16th
- Emailed contributors for unfinished DVD content
15th
- Created Log page to track my OSE involvement
- Organizing CSK v0.01 wiki pages
14th
- Generated current needs for CSK DVD v0.01 production
- Downloaded CSK v0.01 videos for DVD production
13th
- Organized some CSK v0.01 wiki pages
- Downloaded some CSK v0.01 videos for DVD production
11th
- Downloaded CSK v0.01 wiki content for DVD production
10th
- Downloaded some Civilization Starter Kit (CSK) v0.01 wiki content for DVD production
- Skyped with Marcin regarding project involvement
9th
- Filmed Team Culturing Video
7th
- Posted Team Culturing Survey answers