XM Component Test Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "Category:XM")
 
No edit summary
Line 1: Line 1:
=Suggested Checklist=
*Prototype first- geometry works
*CAE analysis performed for required strength, checks with [[XM Scaling Calculations]]
*Motion simulation performed
*Range of motion analysis via rapid prototype
*
[[Category:XM]]
[[Category:XM]]

Revision as of 02:27, 12 March 2012

Suggested Checklist

  • Prototype first- geometry works
  • CAE analysis performed for required strength, checks with XM Scaling Calculations
  • Motion simulation performed
  • Range of motion analysis via rapid prototype