XM Component Test Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 11: Line 11:
==Working Prototype Level==
==Working Prototype Level==


=Work Product=
*Test Results should be documented at [[XM Component Test Results]] page on wiki.


[[Category:XM]]
[[Category:XM]]

Revision as of 03:10, 12 March 2012

Suggested Checklist

Should include rapid prototyping and working prototypes.

Rapid Prototype Level

  • Prototype first- geometry works
  • CAE analysis performed for required strength, checks with XM Scaling Calculations
  • Motion simulation performed
  • Range of motion analysis via rapid prototype
  • Alignment procedure verified with XM Rapid Prototype

Working Prototype Level

Work Product