XM Component Test Procedure: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
==Working Prototype Level== | ==Working Prototype Level== | ||
=Work Product= | |||
*Test Results should be documented at [[XM Component Test Results]] page on wiki. | |||
[[Category:XM]] | [[Category:XM]] |
Revision as of 03:10, 12 March 2012
Suggested Checklist
Should include rapid prototyping and working prototypes.
Rapid Prototype Level
- Prototype first- geometry works
- CAE analysis performed for required strength, checks with XM Scaling Calculations
- Motion simulation performed
- Range of motion analysis via rapid prototype
- Alignment procedure verified with XM Rapid Prototype
Working Prototype Level
Work Product
- Test Results should be documented at XM Component Test Results page on wiki.