XM Component Test Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 4: Line 4:


==Rapid Prototype Level==
==Rapid Prototype Level==
*Prototype first- geometry works
*Build a rapid prototype first
*CAE analysis performed for required strength, checks with [[XM Scaling Calculations]]
*PerformCAE analysis performed for required strength, checks with [[XM Scaling Calculations]]
*Motion simulation performed
*Motion simulation performed
*Range of motion analysis via rapid prototype
*Range of motion analysis via [[XM Rapid Prototyping]]
*Alignment procedure verified with [[XM Rapid Prototype]]
*Alignment procedure verified via [[XM Rapid Prototyping]]
==Working Prototype Level==
==Working Prototype Level==


=Work Product=
=Work Product=


*Test Results should be documented at [[XM Component Test Results]] page on wiki.
*Test Results should be documented at [[XM Component Test Results]] page on wiki. Each of the above points should be documented as a basis for massive distributed collaboration.


[[Category:XM]]
[[Category:XM]]

Latest revision as of 03:13, 12 March 2012

Suggested Checklist

Should include rapid prototyping and working prototypes.

Rapid Prototype Level

Working Prototype Level

Work Product

  • Test Results should be documented at XM Component Test Results page on wiki. Each of the above points should be documented as a basis for massive distributed collaboration.