Proposal Brief: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "The development process for GVCS technologies consists of 28 steps outlined in the GVCS Development Template. Step 8 includes a Proposal Brief - *Problem statement *...")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 8: Line 8:
*Timeline
*Timeline


After the [[Proposal Brief]] is presented by the developer, it is reviewed based on [[OSE Specifications]].  
After the [[Proposal Brief]] is presented by the developer, it is reviewed by a [[Proposal Review Team]] based on [[OSE Specifications]].  


Key points of the review are assessment of the following properties for the solution proposed:
Key points of the review are assessment of the following properties for the solution proposed:
Line 28: Line 28:




 
[[Category:Bidding]]
 
[[Category:Proposals]]
[[Category:Proposal 2012]]
[[Category:Proposal 2012]]

Latest revision as of 17:32, 25 July 2012

The development process for GVCS technologies consists of 28 steps outlined in the GVCS Development Template. Step 8 includes a Proposal Brief -

  • Problem statement
  • Solution and design rationale
  • Conceptual diagram
  • Budget
  • Clear list of deliverables
  • Timeline

After the Proposal Brief is presented by the developer, it is reviewed by a Proposal Review Team based on OSE Specifications.

Key points of the review are assessment of the following properties for the solution proposed:

  • Interoperability and modularity within the context of the rest of the GVCS
  • Scalability of the solution: in performance based on size or number; in scalability of production of the solution
  • Lifetime design
  • Design for manufacturability
  • Ability to source widely-accessible or local materials
  • Design for manual assembly
  • Replicability of the solution
  • Economic significance based on industry standards
  • Distributive economic potential
  • Ecological features of the solution
  • Contribution to a modern standard of living


A Developer Contract is then signed. The Problem Statement defines the basic need and Solution defines how the need is met. Adherence to OSE Specifications is key.