Solar Village 2010: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(24 intermediate revisions by 5 users not shown)
Line 3: Line 3:
Review of concept to date:
Review of concept to date:


*CEB walls
* [[CEB]] walls
*Straw bale infill between 2 wall cavities
* Straw bale infill between 2 wall cavities
*House-integrated CEB stove
* House-integrated CEB stove
*Thermaclear or Solexx glazing
* Thermaclear or Solexx glazing
*Structure similar to  
* Structure similar to [[Image:Nicesolar.jpg|100px]] but solar cover extends from green roof
*Greenspace
* Greenspace
*Trellis for solar shade in summer
* [[Green roof]]
*Composting toilet
* Trellis for solar shade in summer
*CEB floor
** Trellis is covered partly with roofing material with solar angle to allow for solar gain only in winter
*Side space covered for rain and CEB water cistern
** Rest of trellis will be growing grapes
*Planter in front and sides
* [[Composting Toilet]]
*
* CEB floor
* Side space covered for rooftop rainwater catchment and CEB water cistern
* Planter in front and sides - zone 0 plantings in planter
** [[Keyhole garden]]


=Steps=
#Site prep - flatten site with front loader and blade
##Build blade
##Build LifeTrac II
##Build sawmill
#Building material prep
##Rollers
##Sawmilling in July
##Truss preparation
##Test stabilized bricks
##Test reject lime-cement bricks
##Air-powered water pump


[[Category:CEB Construction]][[Category:Solar Village]]
Summary: May will be heavy equipment building time, and June-July will be shakedown of all the building equipment, techniques, water system and site prep, and production of materials (lumber, brick, mortar). August 1 - house is going up.
 
'''Uniqueness summary: LifeTrac II, Sawmill, Air powered water pump, CEB stove, CEB floor, OS blade, PowerCube II, CEB-Straw Bale hybrid
'''
 
=Timeline=
 
*August 1-30 - Complete and deploy [[LifeTrac II]]
*August 1-30 - Build [[The Liberator]], [[Power Cube II]], [[Soil Pulverizer II]]
 
[[Category: CEB Construction]]
[[Category:Factor e Farm]]

Latest revision as of 04:48, 1 December 2012

Steps For Building a Solar Structure

Review of concept to date:

  • CEB walls
  • Straw bale infill between 2 wall cavities
  • House-integrated CEB stove
  • Thermaclear or Solexx glazing
  • Structure similar to Nicesolar.jpg but solar cover extends from green roof
  • Greenspace
  • Green roof
  • Trellis for solar shade in summer
    • Trellis is covered partly with roofing material with solar angle to allow for solar gain only in winter
    • Rest of trellis will be growing grapes
  • Composting Toilet
  • CEB floor
  • Side space covered for rooftop rainwater catchment and CEB water cistern
  • Planter in front and sides - zone 0 plantings in planter

Steps

  1. Site prep - flatten site with front loader and blade
    1. Build blade
    2. Build LifeTrac II
    3. Build sawmill
  2. Building material prep
    1. Rollers
    2. Sawmilling in July
    3. Truss preparation
    4. Test stabilized bricks
    5. Test reject lime-cement bricks
    6. Air-powered water pump

Summary: May will be heavy equipment building time, and June-July will be shakedown of all the building equipment, techniques, water system and site prep, and production of materials (lumber, brick, mortar). August 1 - house is going up.

Uniqueness summary: LifeTrac II, Sawmill, Air powered water pump, CEB stove, CEB floor, OS blade, PowerCube II, CEB-Straw Bale hybrid

Timeline