Prototyping Standards: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(One intermediate revision by the same user not shown) | |||
Line 8: | Line 8: | ||
*Fabricator Training via assembly of scale models by Collaborative Production Run participants | *Fabricator Training via assembly of scale models by Collaborative Production Run participants | ||
*2 Hour Training Session for participants on shop procedure, safety, and tool use | *2 Hour Training Session for participants on shop procedure, safety, and tool use | ||
==Torch CAM Detail== | |||
*Label libraries and dimensions in LibreCAD, not in google docs - to make it easier to make updates to drawings. Use Google Docs for publishing only for additional notes and comments. | |||
=Details= | =Details= | ||
To accomplish the above, these Design roles can be taken on in parallel: | To accomplish the above, these Design roles can be taken on in parallel: | ||
Line 16: | Line 17: | ||
*Economic Analysis | *Economic Analysis | ||
*Ergonomic Analysis - determines the time required for a complete build based in 30 IPM cut through 1/2" mild steel with a 55 amp plasma cutter. See [[Plasma Cutter Cut Speed as a Function of Metal Thickness]]. | *Ergonomic Analysis - determines the time required for a complete build based in 30 IPM cut through 1/2" mild steel with a 55 amp plasma cutter. See [[Plasma Cutter Cut Speed as a Function of Metal Thickness]]. | ||
=Links= | |||
*See also [[Digital Fabrication Diagram Standards]] |
Latest revision as of 23:20, 12 December 2012
As of 2012, OSE migrated to this method of prototyping - essentially to allow 1 month of preparation and 1-2 day builds:
- Extensive preparation - CAD and fab drawings
- Usage of Fabrication Diagram Method
- Migration towards CNC torch table cutouts as in Digital Master Index
- Collaborative Production Runs - parallel builds with many people
- Scale Modeling of devices prior to builds - test-driven development
- Fabricator Training via assembly of scale models by Collaborative Production Run participants
- 2 Hour Training Session for participants on shop procedure, safety, and tool use
Torch CAM Detail
- Label libraries and dimensions in LibreCAD, not in google docs - to make it easier to make updates to drawings. Use Google Docs for publishing only for additional notes and comments.
Details
To accomplish the above, these Design roles can be taken on in parallel:
- CAD generation
- Documentation of preparation for the production run (CAD, procedures, logistics) according to Documentation Standards for Collaborative Prototyping
- CAM generation
- Economic Analysis
- Ergonomic Analysis - determines the time required for a complete build based in 30 IPM cut through 1/2" mild steel with a 55 amp plasma cutter. See Plasma Cutter Cut Speed as a Function of Metal Thickness.