Polylactic acid log: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=Worklog= <html> <iframe width='100%' height='225' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0Aouavp83lY-GdE1QRG9IcTQ5NEQzcnFlQVNGeDk1ZlE&single=true&gid=4...") |
No edit summary |
||
Line 5: | Line 5: | ||
[https://docs.google.com/spreadsheet/ccc?key=0Aj7WbjRT9mlmdFNmTDNadHlrUDJfb2VmMjhYOGV3SGc#gid=1 EDIT] | [https://docs.google.com/spreadsheet/ccc?key=0Aj7WbjRT9mlmdFNmTDNadHlrUDJfb2VmMjhYOGV3SGc#gid=1 EDIT] | ||
=To Do= | |||
*Year end collaborator update | |||
*Finalize literature review/ background information | |||
**Transwiki to appropedia | |||
*Finalize necessary equipment and materials | |||
**Communicate with Pearce group to determine available equipment | |||
**Cost of materials to be purchased - create estimated budget | |||
*Finalize process procedures | |||
**Optimization steps | |||
**Interesting open questions | |||
*Material implementation | |||
**Build fermentor | |||
**Production sprint at MTU | |||
=Daily Log= | =Daily Log= |
Revision as of 17:56, 28 December 2012
Worklog
To Do
- Year end collaborator update
- Finalize literature review/ background information
- Transwiki to appropedia
- Finalize necessary equipment and materials
- Communicate with Pearce group to determine available equipment
- Cost of materials to be purchased - create estimated budget
- Finalize process procedures
- Optimization steps
- Interesting open questions
- Material implementation
- Build fermentor
- Production sprint at MTU