Technical Review Team: Difference between revisions
Jump to navigation
Jump to search
(Redirected page to Extreme Manufacturing Review Team) |
No edit summary |
||
Line 1: | Line 1: | ||
Last Updated April, 2013. | |||
The review team has the duty of performing ongoing review of designs for GVCS machines. | |||
The point of this is to ensure that designs follow modularity and product ecology (modules are interchangeable as part of a greater set). | |||
=Links= | |||
*[[Technical Review Team Guidelines]] |
Revision as of 11:46, 2 April 2013
Last Updated April, 2013.
The review team has the duty of performing ongoing review of designs for GVCS machines.
The point of this is to ensure that designs follow modularity and product ecology (modules are interchangeable as part of a greater set).