Technical Review Team: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
The review team has the duty of performing ongoing review of designs for GVCS machines. | The review team has the duty of performing ongoing review of designs for GVCS machines. | ||
The point of this is to ensure that designs follow modularity and product ecology | The point of this is to ensure that designs follow modularity and product ecology of the [[Global Village Constrcution Set]] - modules are interchangeable as part of a greater set. | ||
=Links= | =Links= | ||
*[[Technical Review Team Guidelines]] | *[[Technical Review Team Guidelines]] |
Revision as of 11:46, 2 April 2013
Last Updated April, 2013.
The review team has the duty of performing ongoing review of designs for GVCS machines.
The point of this is to ensure that designs follow modularity and product ecology of the Global Village Constrcution Set - modules are interchangeable as part of a greater set.