Brian Log: Difference between revisions
Brian Peters (talk | contribs) No edit summary |
Brian Peters (talk | contribs) |
||
Line 1: | Line 1: | ||
=Mon, May 27, 2013= | =Mon, May 27, 2013= | ||
Starting with [[User:Samthetechie]]'s file [[File:Warehouse.skp]] I designed the Boom of the Backhoe. I included a 30 degree joint in order increase the depth and reach of the bucket. The joint is two 8 inch wide plates welded together. The holes in the joint are standard 1 inch diameter. On the interior of the joint is a Wedge. The wedge will fill in the gap between the 4 inch tubing and should be welded thereto in order to ensure maximum strength. If the joint needs to be made stronger more may be added. I also included the plate for attaching the hydraulic cylinder which will control the vertical movements of the Boom and Stick. Next item to be worked on will be the Bucket and its attachment to the Stick. The work can be found at [[File:Warehouse11.skp]] | Starting with [[User:Samthetechie]]'s file [[File:Warehouse.skp]] I designed the Boom of the Backhoe. I included a 30 degree joint in order increase the depth and reach of the bucket. The joint is two 8 inch wide plates welded together. The holes in the joint are standard 1 inch diameter. On the interior of the joint is a Wedge. The wedge will fill in the gap between the 4 inch tubing and should be welded thereto in order to ensure maximum strength. If the joint needs to be made stronger more may be added. I also included the plate for attaching the hydraulic cylinder which will control the vertical movements of the Boom and Stick. Next item to be worked on will be the Bucket and its attachment to the Stick. The work can be found at [[File:Warehouse11.skp]] | ||
[[File:Stick and Boom.png]] | |||
=Sat, May 25, 2013= | =Sat, May 25, 2013= |
Revision as of 23:44, 28 May 2013
Mon, May 27, 2013
Starting with User:Samthetechie's file File:Warehouse.skp I designed the Boom of the Backhoe. I included a 30 degree joint in order increase the depth and reach of the bucket. The joint is two 8 inch wide plates welded together. The holes in the joint are standard 1 inch diameter. On the interior of the joint is a Wedge. The wedge will fill in the gap between the 4 inch tubing and should be welded thereto in order to ensure maximum strength. If the joint needs to be made stronger more may be added. I also included the plate for attaching the hydraulic cylinder which will control the vertical movements of the Boom and Stick. Next item to be worked on will be the Bucket and its attachment to the Stick. The work can be found at File:Warehouse11.skp
Sat, May 25, 2013
Hey Brian, thanks for collaborating with User:Marcin and User:Samthetechie on the Backhoe today, can you write a few notes on your findings / approach for today. Also, you might find these new parts I uploaded helpful / interesting: File:Boom.skp and File:Stick.skp
Fri, May 17, 2013
Talked to Marcin about Backhoe Stick and Boom Concept Specification. Started work on the backhoe stick and boom. Made stock parts and did an assembly of the boom.
Links to Nickle Iron Battery (NiFe Battery)
Edison Patents
http://www.google.com/patents/US678722 http://www.google.com/patents/US692507
Helpful Youtube Videos
The author of the video "edsworkshop" has several videos from 1.0-1.15 on how to make a nickle iron battery. Below is the link to the first video.