Chris DeAngelis Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:


===June 10, Monday===
===June 10, Monday===
[[Image:Chris-june10-side.PNG|x200px]]
[[Image:Chris-june10-iso.PNG|x200px]]
[[Image:Chris-june10-top.PNG|x200px]]
[[Image:Chris-june10-back.PNG|x200px]]
*optimized truck pivot  [[File:Truck_full.skp]]
*optimized truck pivot  [[File:Truck_full.skp]]



Revision as of 21:55, 10 June 2013

Sketchup Files

June 10, Monday

Chris-june10-side.PNG Chris-june10-iso.PNG Chris-june10-top.PNG Chris-june10-back.PNG


June 7, Friday

Truck full.PNG June 7 chris b.PNG Juasdfafne 7.PNG Chris 102348018.PNG

  • OSE Truck suspension system with leaf springs

9682 tri-5 gasser front spindle-lg.jpg Kcspring.jpg Leafs1.jpg Spring3.png

June 6, Thursday

  • added leaf springs

Chris6-7-13-a.PNG

  • Progress on the front cab
  • added leg room, finished roll cage

Front cab.png Cab front b.PNG Front cab c.PNG Truck hinge2.PNG

4wayhingechris.png File:4 way hinge.skp 4waychris b.PNG Twisting joint.PNG

June 5, Wednesday

June5b.PNG

  • File:Truck front.skp
  • Pushed forward Truck Cab design
  • created models of driver and passenger to help get a feel for the size and space of the Cab.
  • Updated Warehouse.skp
  • Also found some good images that helped brainstorm ideas

9682 tri-5 gasser front spindle-lg.jpg Kart-Steering.jpg Bed and cab frame.JPG

June 4, Tuesday

Chris6-4-2013.PNG File:Quick attach.skp

June 3, Monday

Old screenshot.png File:Quick attach.skp

May 31, 2013

Micro track scaled 1-4.PNG File:Adjusted 1-4 scale.skp

  • Created 1:4 scale of microtrac trac for 3d scale model printing purposes

May 30, 2013

Arrived at Factor e Farm today. Got some food and supplies from Dungy's and Dollar General. Purchased 2 boxes of probiotic formula for the HabLab septic tank. Added a full box to the tank. System should get a half box every month. Created a public expense list, with public commenting enabled, here.