Bulldozer/Manufacturing Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 2: Line 2:


==Cab==
==Cab==
===valves===


==Bed==
==Bed==

Revision as of 23:59, 24 June 2013

Modules

Cab

valves

Bed

Under side

Parts

  • 4x4
    • 4 80"
    • 2 72"
  • 8 Hinge Plates
  • 2 QA mounts
    • 2 QD-SDS
    • 2 11T
  • 2 Geardown modules
    • 2 45T
    • 1 Wheel mount
    • 1 Wheel

  1. space the 72" 4x4s 80" apart
  2. set two of the 80" 4x4s at either end of th 72" 4x4s
  3. bolt corners together
  4. set two 80" 4x4s 4inches inward from the first two
  5. bolt together

  1. place four of the hinge plates on the outer verticle face of the 72" 4x4s
  2. bolt together
  3. repeat on opposite 72"

  1. mount quick attach wheel module 12inches from from the front of the left side 80" 4x4s
  2. mout geardown module 8inches from quick attach wheel module
  3. on opposite side mount the quick attach wheel module 44inches from the front
  4. mount the geardown module 8inches in front of the quick attach wheel module

  1. install the pivot shaft

Wheels

Groundhug Pivot

Pivot

Loader

Blade

Powercube [5/5]

edit [1/5]


edit [2/5]


edit [3/5]


edit [4/5]


edit [5/5]