Kakwa Ecovillage Planning: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web")
 
No edit summary
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Mar 10, 2014=
#Backup on not finishing - finishing fabrication.
#May event - lecture at University; University of Upper British Columbia.
#Local fab infrastructure.
Local fabrication in Prince George. Edmonton + Vancouver.
2000 sf requirement - building a shelter - covered. Shelter can be made. But working surfaces? Welding tables? Outstanding issue.
4x8 of 1/4" = 320 $320. One equivalent welding surface.
UNBC - U Northern British Columbia.
MOU is next step - critical cutoffs - number of people, welding tables, workshop up, parts in.  Fee for food included in admission price.
=March 1 Budget=
Spreadsheet with Russ - [https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0ArNBTd6xfT7MdEgxX25McklNYXhaUWtYVDNTMlJWTEE&usp=sharing#gid=0]. Currently planning two 5 day events, 24 people in full house - Russ thinks we should not have an issue filling the workshop up.
https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web
https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web

Latest revision as of 20:45, 10 March 2014

Mar 10, 2014

  1. Backup on not finishing - finishing fabrication.
  2. May event - lecture at University; University of Upper British Columbia.
  3. Local fab infrastructure.

Local fabrication in Prince George. Edmonton + Vancouver. 2000 sf requirement - building a shelter - covered. Shelter can be made. But working surfaces? Welding tables? Outstanding issue.

4x8 of 1/4" = 320 $320. One equivalent welding surface.

UNBC - U Northern British Columbia.

MOU is next step - critical cutoffs - number of people, welding tables, workshop up, parts in. Fee for food included in admission price.

March 1 Budget

Spreadsheet with Russ - [1]. Currently planning two 5 day events, 24 people in full house - Russ thinks we should not have an issue filling the workshop up.

https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web