Kakwa Ecovillage Planning: Difference between revisions
Jump to navigation
Jump to search
(Created page with "https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web") |
No edit summary |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=Mar 10, 2014= | |||
#Backup on not finishing - finishing fabrication. | |||
#May event - lecture at University; University of Upper British Columbia. | |||
#Local fab infrastructure. | |||
Local fabrication in Prince George. Edmonton + Vancouver. | |||
2000 sf requirement - building a shelter - covered. Shelter can be made. But working surfaces? Welding tables? Outstanding issue. | |||
4x8 of 1/4" = 320 $320. One equivalent welding surface. | |||
UNBC - U Northern British Columbia. | |||
MOU is next step - critical cutoffs - number of people, welding tables, workshop up, parts in. Fee for food included in admission price. | |||
=March 1 Budget= | |||
Spreadsheet with Russ - [https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0ArNBTd6xfT7MdEgxX25McklNYXhaUWtYVDNTMlJWTEE&usp=sharing#gid=0]. Currently planning two 5 day events, 24 people in full house - Russ thinks we should not have an issue filling the workshop up. | |||
https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web | https://docs.google.com/a/opensourceecology.org/document/d/1uwQXJQY58FyCCD_tECvNVo5fe4gLKmWLKDuDAEAtJ_k/edit?usp=drive_web |
Latest revision as of 20:45, 10 March 2014
Mar 10, 2014
- Backup on not finishing - finishing fabrication.
- May event - lecture at University; University of Upper British Columbia.
- Local fab infrastructure.
Local fabrication in Prince George. Edmonton + Vancouver. 2000 sf requirement - building a shelter - covered. Shelter can be made. But working surfaces? Welding tables? Outstanding issue.
4x8 of 1/4" = 320 $320. One equivalent welding surface.
UNBC - U Northern British Columbia.
MOU is next step - critical cutoffs - number of people, welding tables, workshop up, parts in. Fee for food included in admission price.
March 1 Budget
Spreadsheet with Russ - [1]. Currently planning two 5 day events, 24 people in full house - Russ thinks we should not have an issue filling the workshop up.