Kakwa Ecovillage Planning: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
#May event - lecture at University; University of Upper British Columbia. | #May event - lecture at University; University of Upper British Columbia. | ||
#Local fab infrastructure. | #Local fab infrastructure. | ||
Local fabrication in Prince George. | Local fabrication in Prince George. Edmonton + Vancouver. | ||
2000 sf requirement - building a shelter - covered. Shelter can be made. But working surfaces? Welding tables? Outstanding issue. | |||
4x8 of 1/4" = 320 $320. One equivalent welding surface. | |||
UNBC - U Northern British Columbia. | |||
MOU is next step - critical cutoffs - number of people, welding tables, workshop up, parts in. Fee for food included in admission price. | |||
=March 1 Budget= | =March 1 Budget= |
Latest revision as of 20:45, 10 March 2014
Mar 10, 2014
- Backup on not finishing - finishing fabrication.
- May event - lecture at University; University of Upper British Columbia.
- Local fab infrastructure.
Local fabrication in Prince George. Edmonton + Vancouver. 2000 sf requirement - building a shelter - covered. Shelter can be made. But working surfaces? Welding tables? Outstanding issue.
4x8 of 1/4" = 320 $320. One equivalent welding surface.
UNBC - U Northern British Columbia.
MOU is next step - critical cutoffs - number of people, welding tables, workshop up, parts in. Fee for food included in admission price.
March 1 Budget
Spreadsheet with Russ - [1]. Currently planning two 5 day events, 24 people in full house - Russ thinks we should not have an issue filling the workshop up.