=Introduction=
Hello OSE Collaborators - As a globally collaborative organization, part of our work involves soliciting feedback from the greater open-source development community. This is your chance to provide a meaningful contribution of knowledge to the project - especially if you have knowledge of construction, architecture, or natural building. We have a design; however, we are looking for review in order to improve on it.
We have a complete sketchup file of the design of Microhouse 3 - http://opensourceecology.org/w/images/5/54/MicroHouse3.skp. We have a general outline of the build procedure - https://docs.google.com/document/d/1EXgaR4InhPHs_h1hFbhnLfOnXVYJQJz8fZBefEKdIHU/edit. We also have many pictures of the build - https://opensourceecology.trovebox.com/photos/album-1u/list.
We have completed an initial stage of construction and are presently reviewing the architecture before proceeding. At this stage, we have almost completed the bricks for the first floor.
Here are our questions specific questions:
http://opensourceecology.org/wiki/MicroHouse_3_-_Module_-_Review#Review_Questions
To answer any of these questions, please see the response form here:
http://opensourceecology.org/wiki/MicroHouse_3_-_Module_-_Review
Thanks,
OSE Team
=MicroHouse Review Response Form=
=MicroHouse Review Response Form=
<html>
<html>
<iframe src="https://docs.google.com/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/viewform?embedded=true" width="760" height="500" frameborder="0" marginheight="0" marginwidth="0"></iframe><br/></html>
<iframe src="https://docs.google.com/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/viewform?embedded=true" width="760" height="500" frameborder="0" marginheight="0" marginwidth="0"></iframe><br/></html>


'''[ See Responses]'''
'''[https://docs.google.com/a/opensourceecology.org/spreadsheets/d/1d7aH-m0ir0jfcZa1yivUvp6cINDXZr6eeH3eCmLtsK8/edit#gid=1714534416 See Responses]'''
 
[https://docs.google.com/a/opensourceecology.org/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/edit .]
 
=Review Venues=
*Natural Building - Reddit - http://www.reddit.com/r/NaturalBuilding
*Home Improvement - Stack Exchange - http://diy.stackexchange.com/. Ex - [http://diy.stackexchange.com/questions/47874/what-is-the-best-baseboard-hydronic-heating-radiator-out-there-for-cost-and-long]
*Permies - Green Building Forum - [http://www.permies.com/t/38912/green-building/Hydronic-Heating-Wood-Stove#303254]
*Architecture for Humanity - [http://openarchitecturenetwork.org/projects/microhouse_4]


=Review Request Document=
=Review Request Document=
<html><iframe src="https://docs.google.com/document/d/18H7raBuDJRGA0B-7MiYmyDmBFUZyWwY_UBogVh1YhKo/pub?embedded=true" width=100% height=500></iframe></html><br/>[https://docs.google.com/document/d/18H7raBuDJRGA0B-7MiYmyDmBFUZyWwY_UBogVh1YhKo/edit edit this document]
<html><iframe src="https://docs.google.com/document/d/18H7raBuDJRGA0B-7MiYmyDmBFUZyWwY_UBogVh1YhKo/pub?embedded=true" width=100% height=500></iframe></html><br/>[https://docs.google.com/document/d/18H7raBuDJRGA0B-7MiYmyDmBFUZyWwY_UBogVh1YhKo/edit edit this document]


=Review Question Media=
=Review Questions=
'''Download design file - [[File:MicroHouse3.skp]]'''
 
We are soliciting feedback on the entire design. In particular, we have 3 questions, below. Please use form above to respond.
 
==Question 1==
==Question 1==
Should the first floor bond beam go around the entire perimeter of the house?
Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?


[[File:BondBeam.jpg|500px]]
[[File:BondBeam.jpg|500px]]
[[Image:bondbeam2.jpg|400px]][[Image:bondbeam3.jpg|400px]]


==Question 2==
==Question 2==
Is the mounting of rafters to the upper and lower mid truss strong enough?
Is the mounting of rafters to the upper and lower mid truss strong enough? Currently, there is a bird's mouth connection, but the upper end of the rafter is connected only at the bird's mouth. Should the upper end of the rafter be connected at its whole face? or use long screws (6") to connect upper part of rafter to upper truss from the back?


[[File:MidTruss1.jpg|500px]]
[[File:MidTruss1.jpg|500px]]
Line 29: Line 58:


[[File:Roof.jpg|500px]]
[[File:Roof.jpg|500px]]
==Question 4==
2nd floor truss - should it extend to sit on outer wall, not only on inner wall of double layer wall?

Latest revision as of 21:37, 22 August 2014

Introduction

Hello OSE Collaborators - As a globally collaborative organization, part of our work involves soliciting feedback from the greater open-source development community. This is your chance to provide a meaningful contribution of knowledge to the project - especially if you have knowledge of construction, architecture, or natural building. We have a design; however, we are looking for review in order to improve on it. We have a complete sketchup file of the design of Microhouse 3 - http://opensourceecology.org/w/images/5/54/MicroHouse3.skp. We have a general outline of the build procedure - https://docs.google.com/document/d/1EXgaR4InhPHs_h1hFbhnLfOnXVYJQJz8fZBefEKdIHU/edit. We also have many pictures of the build - https://opensourceecology.trovebox.com/photos/album-1u/list.

We have completed an initial stage of construction and are presently reviewing the architecture before proceeding. At this stage, we have almost completed the bricks for the first floor.

Here are our questions specific questions: http://opensourceecology.org/wiki/MicroHouse_3_-_Module_-_Review#Review_Questions

To answer any of these questions, please see the response form here: http://opensourceecology.org/wiki/MicroHouse_3_-_Module_-_Review

Thanks, OSE Team

MicroHouse Review Response Form


See Responses

.

Review Venues

Review Request Document


edit this document

Review Questions

Download design file - File:MicroHouse3.skp

We are soliciting feedback on the entire design. In particular, we have 3 questions, below. Please use form above to respond.

Question 1

Should the first floor bond beam go around the entire perimeter of the house? Note that the bond beam is split between 2 house levels. Should it go all around the house on top of level 1?

Error creating thumbnail: File missing
Error creating thumbnail: File missing
Error creating thumbnail: File missing

Question 2

Is the mounting of rafters to the upper and lower mid truss strong enough? Currently, there is a bird's mouth connection, but the upper end of the rafter is connected only at the bird's mouth. Should the upper end of the rafter be connected at its whole face? or use long screws (6") to connect upper part of rafter to upper truss from the back?

Error creating thumbnail: File missing
Error creating thumbnail: File missing

Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?

Error creating thumbnail: File missing

Question 3

In what order should the flashing, tar paper, and corrugated roofing be installed?

Error creating thumbnail: File missing

Question 4

2nd floor truss - should it extend to sit on outer wall, not only on inner wall of double layer wall?