CEB Press Development Hours: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*Builds - 40*8 a= 320 hours *Runtime - 16*8 = 130 hours *Design - 320+320+80 *Documentation - 480 (2014) + 160 + 160 *")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
*Builds - 40*8 a= 320 hours
*Prototype builds - 20 weeks * 40/week = 800
*Runtime - 16*8 = 130 hours
*Final builds - 40*12 a= 480 hours
*Runtime - 16*8 + 50 for the first = 180 hours
*Design - 320+320+80
*Design - 320+320+80
*Documentation - 480 (2014) + 160 + 160
*Documentation - 480 (2014) + 160 + 160
*
*Soil pulverizer - 320
*Soil mixer - 160
*Tractor - 800
*Power Cube - 800
*Documented total - ~4910 hours.
 
=Method 2=
*1 full year person (minimum) per CEB, tractor, power cube - 6000 hours

Latest revision as of 17:37, 20 May 2019

  • Prototype builds - 20 weeks * 40/week = 800
  • Final builds - 40*12 a= 480 hours
  • Runtime - 16*8 + 50 for the first = 180 hours
  • Design - 320+320+80
  • Documentation - 480 (2014) + 160 + 160
  • Soil pulverizer - 320
  • Soil mixer - 160
  • Tractor - 800
  • Power Cube - 800
  • Documented total - ~4910 hours.

Method 2

  • 1 full year person (minimum) per CEB, tractor, power cube - 6000 hours